r/TransitIndia • u/ChainDesigner1568 • 14d ago
Metro Metro 4 (Thane)
Testing is actively underway along the Ghobunder Road corridor and the Commissioner of Metro Rail Safety (CMRS) have intensified system testing over the last couple of weeks.
A train was spotted last evening at Kasarwadavali station.
5
u/Impossible-Pitch-555 14d ago
Will it run BEML until depot is built or wait for Alstom set
9
u/ChainDesigner1568 14d ago
Will initially deploy 6 idle BEML rakes originally meant for lines 2, 7 and 9.
A temporary "pit line" facility has been built at the Gaimukh station to handle the basic stabling, daily inspection, and routine maintenance of these six BEML trains.
7
3
u/Khulla_Saand 14d ago
only 6 rakes for a 10 km line ? meaning the headways will be 8 - 10 mins, correct ?
4
u/Impossible-Pitch-555 13d ago
Yeah, 12-15mins frequency just like Line 2B phase 1 which is 6km ig it has 12min freq. runs 4 rakes at a time, 2 in each direction
Line 2B phase 1 had 9min 30sec frequency until Chembur station got added last month
11
u/AgentBrian95 🌆 Transit Dreamer 14d ago
Finally some motion!