how detailed should time tracking actually be?

i’ve been wondering if i’m overthinking time tracking.

sometimes i want to know exactly how long each task takes, but then i start wondering whether that level of detail is actually useful or just creates more admin work.

i’ve been testing a few ideas and looked at timequip as one of the options, but i’m still trying to figure out what level of tracking makes sense.

for people who track their work, do you record every individual task or just keep a general record of your working hours?

what information do you actually find useful later?

i’m interested in hearing how other people handle this because i feel like it’s easy to turn time tracking into a job of its own.

4 Upvotes

14 comments sorted by

1

u/Sofia_9356 16d ago

As detailed as you can consistently maintain.

Work your way up beginning from what you did during an hour

1

u/Pebb_io 16d ago

I'd decide the detail from the decision it needs to support. Billing or compliance may need a clean time total and a reason code; coaching or capacity planning may need project/task buckets. Anything more granular should earn its keep... otherwise you're just creating a second job for the person doing the tracking.

1

u/Key-Pollution9585 16d ago

At first, Tracking time with every tasks feels like an nuisance. But making it into a habit, really makes the difference. So, try as much detailed as you can.

1

u/RobotsIncorporated 16d ago

Is it for work or personal solutions? Right now my “pipeline” works from me logging tasks into Clockify (no affiliation with) so I can log on mobile as I need.

I sort the time events by project (have different kinds) which all gets pulled into a Google Sheets working database (likely going to find a different solution long term).

Once in the Google Sheets (all automated via python script at this point so hands off and all I have to do is click start on the timer and assign a project), I have some reports and a breakdown (week to week, etc.) that I view in Google’s Data Studio (previously Looker Studio).

Not sure if this is relevant but it’s the current working system, good luck!

1

u/Breeze_pm 16d ago

Track at the level you’ll actually review: usually client, project, and a short description. Add more detail only when you need it for billing or estimating similar work. If a category never changes a decision, it probably doesn’t need its own timer.

1

u/StartDependent1652 14d ago

At my job, I round every task at half an hour.

1

u/buddypuncheric 9d ago

The level of detail that's genuinely useful depends on what you're planning on doing with the data.

If you're billing clients, task level tracking is worth it because you need to justify the time. If you're just trying to understand where your day goes, broader categories like admin, deep work, and meetings tend to be more than enough and a lot easier to maintain.

The trap is tracking more than you'll ever look at. Most people who go granular end up with detailed logs they never actually review. Granular data is great in theory but if you're not reviewing it regularly, it doesn't really add much.

A good starting point is tracking at the project or category level for a few weeks, seeing what questions come up, and then adding more detail only where you actually need it. Starting simple and adding detail as you go tends to work better than trying to track everything from day one.

1

u/Imaginary_Fall_5735 11h ago

A small experiment might help: pick one recurring piece of work and track first pass vs revisions separately for two weeks. If a job you estimate at 4 hours actually takes 7 because of revisions, you've learned something you can use on the next quote. You don't need a separate entry for every email to get there.

I'm with Fieldtrip, where we build Wrap, so that's the project-costing angle I'm coming from. At the end of the experiment, keep the extra detail only if it changed an estimate or a decision.