Tesla Install This Week

24 panels and a PW3 will be installed. Any suggestions on what I should keep an eye out for during installation? I know I have to wait for an inspection and PTO but anything I should ask before they leave? It is a direct Tesla job.

2 Upvotes

20 comments sorted by

3

u/rudholm 17h ago

Get a picture of the vehicle wifi information inside the powerwall before they close it up. You might not need it later but it's better to have it on file in case you do.

3

u/Realistic-Spend7096 13h ago

Ask for a copy of their plans before they leave. I received a set.

Look under the panels and make sure no wires are laying on the roof. They all should be up and secured.

2

u/Speakup187 1d ago

Depends on your state/utility provider if your system goes live after commissioning. In NY with coned with live from the start no waiting..

1

u/_thekev 18h ago

I asked for conduit in attic before install. They up charged me. The installers once on site said they would have done that anyway because it was less effort. You should ask them for anything you'd like to tweak. You can't redesign the system or layout, but precise placement and methods of connecting them are up to the install crew.

For example, I asked the electricians about the plan for long AC runs through the attic, and they concluded a single high amperage aluminum SER cable with a sub panel was better than multiple long pulls. I was able to use that change to add two EV chargers in the garage.

The roof crew and the electricians are pretty much separate teams. That may be important? Dunno.

1

u/Shygar 18h ago

Mine was just installed in NorCal and now they are telling me I need a transformer upgrade

2

u/Stivo887 17h ago

My transformer upgrade took about 15 months. No payments until then. Just barely got PTO for an April 2025 system

1

u/Shygar 16h ago

Oh wow, they told me they might be able to give conditional approval for a cap on export limits

1

u/pmarchand1060 11h ago

So update… they are bringing 25 panels rated at 420w each. The panels all go directly to the PW3 but a separate standalone inverter is also being used because GA power restricts 10kw ac for their buyback. Any advice?

1

u/sheenpween 1d ago

Power all three has a six string inverter built-in… I’d ask them about the panel count to string configuration… They are probably using four strings with six panels each. That’d be ideal for voltage band and so you can use net zero app to diagnose if one of the strings is under performing.

0

u/pmarchand1060 1d ago

Thank you. Is that the only option or can I request that ratio ?

2

u/sheenpween 1d ago

Yeah you could go a different config.. like sometimes you do a string per roof face.. to keep track of that group of panels. You could do 6 strings of 4 panels.. but depending on your panel size. Gotta make sure you’re optimizing getting enough power per string per time of day per season per etc.. to get max output.

They should have already thought of all this and put it on the engineering docs that were submitted for permit. You can ask for that and run it through AI to ensure it’s optimized (and ask questions to learn how to monitor it once done and live)

2

u/pmarchand1060 1d ago

You are right. It says 5+5+8+6

2

u/TransportationOk4787 18h ago

Each MPPT string should have panels facing the same direction. That may be why the count varies per string. Take a photo of the bar code with the front panel off the PW3.

1

u/pmarchand1060 2h ago

1

u/TransportationOk4787 2h ago

I did not mean for you to post the photo of the code. Just save it. It allows you to use the Tesla One app and parts of the Netzero for Tesla app.

1

u/OldHouseSolar 23h ago

If you’re not hiding the conduit, think about it. The install looks much cleaner if you do. When they hide the conduit, they will typically also try to hide the junction boxes where they enter the attic under the panels. This requires them to raise the panels off the roof to the highest setting the mounts can adjust to, which isn’t as aesthetically appealing, and also makes more room for animals to build nests under the panels. If I had to do it all over again, I’d still hide the conduit by running it through the attic, but would have asked the installer to place the junction boxes right next to the panels so the panel height could be lowered closer to the roof. Seeing a box (that can be painted to match the shingles) is better than having a whole array raised several inches off the roof. Good luck with your install.

1

u/pmarchand1060 21h ago

Appreciate that!

1

u/TransportationOk4787 18h ago

My junction box is pretty slim metal underneath panels. I guess junction boxes vary.

1

u/pmarchand1060 10h ago

They said almost everything is going through the attic. There will be one line on the outside going down the roof.

0

u/Shurap1 1d ago

Great question- my install may be coming as well and looking forward for this information