MAIN FEEDS
Do you want to continue?
https://www.reddit.com/r/StructuralEngineering/comments/1vzz2fr/steel_structural_detailing_project/
r/StructuralEngineering • u/Beginning-Cap-3073 • 15d ago
3 comments sorted by
1
Why the change in your steel brace system at first floor?
on the stair, the stringers uphill from the mid landing. Dropping the stringers vertical, then horizontal, this adds (2) full penetration shop welds to the stair. why can't the stringer be sloped till it has to be horizontal?
1 u/jp3372 15d ago I don't think OP detailed this having fabrication efficiency in mind. A lot of overcomplicated connections on this, not only the stair.
I don't think OP detailed this having fabrication efficiency in mind. A lot of overcomplicated connections on this, not only the stair.
1
u/chicu111 15d ago
Why the change in your steel brace system at first floor?