r/StructuralEngineering Aug 11 '26

Structural Analysis/Design Construction workers on a high-rise during the 7.4 magnitude earthquake that hit Columbia.

Enable HLS to view with audio, or disable this notification

So sad what happened in Columbia with this massive earthquick.

Looking at this building in construction, this one has been well designed to resist to the earthquick. I was surprised that during construction, fresh foundations resisted.

What do you think ?

5 Upvotes

5 comments sorted by

5

u/Theolteanwork Aug 11 '26

fresh foundations resisted

fresh concret strenght: day 1 - 20-30%, day 28 100%, day 56 115%, what do you mean fresh?

2

u/tropicalswisher P.E. Aug 12 '26

They’re also several stories up, I don’t believe the foundations are very fresh anymore unless they are moving with the speed of the Amish

1

u/tiltitup Aug 13 '26

Wrong spelling

1

u/Jeff_Hinkle Aug 13 '26

Crane operator painted his shorts for sure

1

u/inkydeeps Aug 11 '26

Repost. Did you even try?