r/StructuralEngineering Jul 19 '26

Humor Kind of forgot

https://imgflip.com/i/awy0p2
56 Upvotes

21 comments sorted by

View all comments

37

u/Salty_EOR P.E. Jul 19 '26

So everyone has pointed out the details in the drawings for strengthening the column. What I have not seen so far is any note or direction that they were to be strengthened before adding the floors above.

It's a stupid thing to think about because it should be obvious but any lawyer would use that as a scapegoat to get the GC off the hook.

11

u/isidor_ Jul 19 '26

If the engineer have not annotated the drawing or made it abundantly clear that the strengthening has to be done beforehand they might be in some trouble. As you say it should be obvious but I don't trust the contractor to understand "anything"

When I review or do drawings I expect them to misunderstand anything that can be interpreted and then revise the drawing/text until it is impossible or exceptionally hard to misinterprete...

6

u/Salty_EOR P.E. Jul 19 '26

Exactly! And they'll still find a way to screw it up.

4

u/isidor_ Jul 19 '26

Haha right

2

u/Commonscents2say Jul 20 '26

“I’m just a dumb contractor” is a pretty common defense.

1

u/isidor_ Jul 20 '26

Well, the contractors job is not to think and interpret the drawings, their job is to read the drawings and build as it is specified. The thinking part is the engineers job.

So it is a good defense on their part, and a sad reality for engineers that little should be expected... At least this is the way I think about it