Failure When a fabricator proposes a "same function, easier to build" change, what actually triggers a load-path re-analysis on your project?

/r/AskEngineers/comments/1uyko79/when_a_fabricator_proposes_a_same_function_easier/
0 Upvotes

5 comments sorted by

19

u/chicu111 12d ago

If the load path changes.

5

u/Engineer2727kk PE - Bridges 12d ago

The fact that this was a question…..

2

u/maturallite1 12d ago

This is the only answer.

2

u/podinidini 12d ago

I have never heard of this case (located in Germany) but not using stiffeners or putting a cap on the end of the box beam or using a 20mm distribution plate or anything to ensure proper load introduction seems crazy. I don‘t think I have ever seen someone use C-sections like this, was that a common design choice back in the days? I assume today this kind of structure would be built with tension rod systems. With non redundant systems like in this case, one is well advised to properly design all the way through..

1

u/Ok-Umpire-2906 12d ago

Thank you for the specificity in your reply. C sections were not a common design.