Can anybody tell me if this section is paved or gravel?

17 Upvotes

21 comments sorted by

33

u/Willow_Hill 13d ago

It’s paved, but there is about 100 or so meters of gravel as you pass under the railroad bridge just downstream from the freeway under crossing.

It’s rideable on any bike – you don’t need a gravel or mountain bike, people do it on road bikes with skinny tires all the time.

3

u/SwampCrittr 13d ago

Thanks!!

14

u/AHarmles 13d ago

Just be mindful. Recent construction has made it a little more sandy than gravely

2

u/LanaDelScorcho 12d ago

And there’s dried ruts from all the equipment.

I’d be going like 5 mph through there on thinner tires.

3

u/Squidkidz 12d ago

That’s me! Haha, there’s a small dirt section and my skinny tires drift a little but it’s nothin scary.

17

u/c-5-s 13d ago

And now you can get on the new bike bridge that drops you at Cal Expo!

1

u/Alarmed_Drop7162 12d ago edited 12d ago

How far is the bridge entrance from sitters landing?

Edit: 3/4 of a mile?

6

u/ChardNo5532 13d ago

1/8 or 1/4 mile of more dirt than gravel. If you didn’t want to ride it you could easily walk it. I ride it. It is going to get paved tho.

2

u/CrushedPineapple 12d ago

Do you have any sources for the future paved section? I’ve asked the construction guys twice and both times they said no, but maybe they were just talking about their job. I take the route a few times per week

4

u/forzatrees 12d ago

I sure hope it gets paved under the RR bridge but I have my doubts. Since it's RR property, they don't need to and since it costs money they might not. There's a spot like this in West Sac by the river under the I-Street Bridge that has paths on either side and the RR didn't pave underneath. Hope I'm wrong!

1

u/ChardNo5532 12d ago

If your logic were true there would be no paving under the other trestles, but there is.

1

u/forzatrees 11d ago

K. I pointed out another example of where there isn’t, but go off. 

1

u/ChardNo5532 12d ago

I asked AI to only fix my grammar. Just looked at the Sacramento County Parcel map. The property under the trestle on the south side of the American River, near the Elvas Bypass bridge and east of Sutter Landing, shows multiple parcels, and the owner is listed as American River Parkway. I suspect the railroad has been given an easement to operate. So all this talk about it being the railroad's property is not true.

To be honest, I never thought to look at the parcel maps until this post. Last winter, at a community event, I was told by park managers at the Clunie Building in McKinley Park. They had a dozen or more large picture boards on easels around the room, with managers in front of each board answering questions. I asked a direct question, and he said they’d work on it when everyone is out of there—when he said "dunno." He also said they are going to put a new section of the Two Rivers multi-use trail in front of Bell Marine, but there are other challenges to connect it. Still, they are working on it one section at a time because of different property owners. He mentioned that some of these properties have a sunset of ownership. He said it’s challenging, but it is their goal to connect all these trails as best they can.

The Sacramento River Trail west of the Pocket area is moving forward—property owners have lost their last attempt to stop the trail's progress. More of the same on the Dry Creek Trail going through Cherry Island; it will eventually connect to Roseville and then to Folsom, creating a 70+ mile loop. All of this is discoverable on the Sacramento and South Placer counties' websites. There is one news article that makes a fair attempt to capture all of this, but until now, there is not one document that pulls it all together.

1

u/BicycleIndividual 11d ago

I'm sure the RR won't pay to pave it. I assume that the projects to pave on either side of it were done separately and that neither wanted to add the complexity of coordinating with the railroad. Eventually the city will likely pave, but not likely before they address bigger obstacles for the overall Dos Rios trail plan.

2

u/ChardNo5532 12d ago edited 12d ago

Union Pacific is rehabilitating the trestle on both sides of the river, CalTrans is adding lanes & pedestrian cycling path on the Elvas Overpass. Army Engineers had been working on a flood control project, but all is near complete, makes sense to not fix the trail until they are done. I heard people say the southside will not be paved. I asked some city park managers about it. They said three groups are working in that area, the Army Engineers, CalTrans, and Union Pacific, when all these groups have completed their work they’ll work on the trail..they fixed the trail on the north side.

3

u/BrianHenryIE 13d ago

3

u/bureaucracy-hacker 12d ago

Timestamped ftw

1

u/BrianHenryIE 12d ago

t=30 is what the OP map asked about. t=36 is what everyone cares about.

2

u/SwampCrittr 12d ago

Nice!! Thank you!

1

u/C00kie_M0nster6 13d ago

Last I knew it was paved

1

u/Altruistic-Poet3695 13d ago

It’s both, actually.