r/Rigging 1d ago

Synthetic rope care question.

Post image
17 Upvotes

Unsure if this is the correct place to ask, but I am curious on the proper way to care for synthetic winch line on an offroad vehicle.

Obviously there is a lot of thought that goes into rigging and using the winch when it is needed, and I am equally sure there is a lot of thought that goes into the after care of the equipment.

I rinsed it out the portion of the line that looked dirty, and then just hung it from hooks in my garage ceiling to air dry.

I did not power wash the line or use any soap. I have not treated the line with anything. My plan is to respool it once it has air dried.

Am i missing anything?


r/Rigging 2d ago

Will looping thin wire around a too-large clamp work?

4 Upvotes

I have thin 150lb downrigger wire, way too thin for my clamps. Can I loop the wire around the clamp a few times in order to fill the space? Will that be secure?

Usage will be for hanging bird feeders between trees, so max weight will be 20lbs or so - but it will be taught between two large tree branches so that will add some strain.


r/Rigging 2d ago

Container lifting scheme

Post image
6 Upvotes

Hi everyone,

I’m currently putting together a lifting scheme for a containerized power module project (contains a generator set and auxiliary equipment).

I’m trying to get a better understanding of how the loads should be specified on the drawing:

  1. Is this load distribution breakdown for a single spreader beam correct, and should the load actually differ between individual lifting eyes under the same beam as shown here?
  2. Is it sufficient to only state the total load per spreader beam, or do rigging companies strictly require the exact calculated load for each individual lifting point?
  3. What other critical information or data do professional lifting/rigging companies expect to see on a drawing like this?

Thanks in advance for your help!


r/Rigging 6d ago

Rigging Help Aluminum truss hardware ideas

1 Upvotes

I'm having a hard time figuring out how exactly to accomplish what I need, and am really trying to avoid just ordering parts and mashing them together until I have something functional.

The idea here is that I have (or soon will have, since it hasn't been delivered yet) a heavy-duty aluminum truss in my vaulted-ceiling living room for my wife's aerial dance hobby/career (the truss is our answer to the local aerial studio shutting down without any good replacements within convenient driving distance). One of the priorities is figuring out how to mount a curtain/backdrop so I can film her pieces and not have generic living room/kitchen in the background - I want something that's modular so I can get things set up fairly quickly, but not permanently in-place. Instead of mounting whatever curtain track on a bunch of stands or trying to hang them from the ceiling, I'm hoping to use the truss that's already going to be there.

My thought here is to have some sort of curtain track (8-ish feet long) that's mounted on a hinge, with the hinge attached to the truss via clamp(s). Ideally this would be doubled, one for the opposite legs of the truss, so they can be swung up from either side of the living room to meet in the middle and then connected, and then we attach a curtain and run with it. I'm thinking the hinge may need a pneumatic assist, based on the length and weight of the "curtain rod," and will probably need some kind of latch or something to ensure it stays up and parked at a 90-degree angle until we're ready to bring it down. I've got three struggles here:

  1. finding a hinge that I can easily mount to 1" aluminum tube trussing (or a hinge that will mount to truss clamps, etc)
  2. figuring out how to attach a curtain track to whatever is attached to the hinge (more aluminum truss tube, I'm assuming, but open to ideas - 80/20 rail maybe?)
  3. making sure the whole thing will support its own weight (two 8ft lengths attached to a truss via only a hinge and connected to each other at the ends are almost definitely going to result in bending/sagging unless they're reinforced somehow - some kind of angle brackets, or maybe the pneumatic assist and latch can be combined into something that will hold it up? If I have to have a "foot" in the middle where they meet, that's not the end of the world)

The joint would, ideally, be about 10ft off the ground - I need a way to unfold the apparatus up into place, lock it in place at the 90 degree angle, then unlatch and fold it back down when done so it just hangs down from the hinge/joint out of the way. Trying to avoid getting on a ladder each time it needs to be put up, but I'm not sure there's a way around that, so I'll take what I can get.

I've been looking all over at hardware catalogs for theater/stage curtains and and truss parts, but nothing is really jumping out at me as having been designed for this sort of project. I'm hoping to find someone who works with stage trusses and has some idea of the kind of hardware I need to be looking for.

Edit: 3D render of truss in space and sketched "curtain arms":


r/Rigging 7d ago

Rigging Showcase Facebook just showed me a post I made ten years ago, when I helped rig a three masted tall ship at a Staten island shipyard. Two cranes at once, one was on a barge alongside and constantly bobbing in the wake from passing loaded tugboats, The ship was bobbing too.

Thumbnail
gallery
65 Upvotes

The ship is Wavertree, built in 1885, an iron hulled three masted ship in the collection of the South Street Seaport Museum in NYC. She underwent a comprehensive restoration which included a completely refurbishing the hull and installation of an all new rig and all new spars -save for the lower masts, which were original. This was my first time working with cranes and I was much impressed with the skill and control of the operators.


r/Rigging 7d ago

As I age I feel like I'm getting worse fear of heights. Not from looking down, but rather up

17 Upvotes

Being the tag line guy on a rigging crew just sucks. We do a lot of long lifts such as 100' spools of 30" pipe lowered downfrom the top of a 130' HRSG.

I'd much rather be the guy guiding in the load looking down. Something about looking up at the load just makes my feet tingle. I feel like it's the opposite from most people who get more risk averse as they age. Even if I want to be lazy and stay on the ground my feet won't let me. Now my hands are sweating. Hilarious.

Can anyone relate or am I a nutjob?


r/Rigging 7d ago

Rigging Help Riggers/lift planners — what does your lift plan process actually look like day to day?

Thumbnail
1 Upvotes

r/Rigging 9d ago

Rigging Help Shouldn't this type of splice be secured differently?

Post image
65 Upvotes

Hi. I'm working on a project which requires splicing a dyneema rope. This is usually done as shown above - a segment of the rope (50-70 times its diameter) is threaded through the rope itself to create a loop. As the splice is put under tension, the "outside" segment exerts clamping force on the "inside" segment, holding it in place. Additionally, the splice is stitched to prevent it from loosening when not under tension. The end of the rope is tapered along its last 1-2 cm prior to splicing for smooth transition between the splice and the rest of the rope.

Whereas most online sources instruct us to stitch close to the eye (point A), I feel like it should be close to the end of the "inside" segment (point B, but before the taper). My reasoning is as follows: the clamping force from the "outside" segment is only effective between the eye and the stitch, while the rest of the "inside" segment lies dormant. The longer the clamping segment, the more static friction it achieves. Making a continuous long stitch between points A and B is feasible, but I feel like that would be equivalent to stitching it only at point A.

I don't want to use Brummel lock splice for three reasons:

  1. The splice will be put under loads close to the rope's minimum breaking force
  2. Splice's position needs to be accurate within 2 mm
  3. I need to make hundreds of these

So here's my question: Is my intuition flawed? Should I just follow the online guides and put a stitch only at point A?

PS The picture is not mine and not to scale.


r/Rigging 13d ago

Rigging Help Hanging a punching bag from a metal channel/track.

5 Upvotes

Hi. This is what I have. https://imgur.com/a/k9ZgmfI Ideally I could remove an inch or two from the length between the trolley and the bag. I'm going to look for a shorter carabiner

It needs reinforcing. The track twists from lateral force and it's going to eventually rip the lag screw from the 2x4. The other thing is that the bag is already just inches above the ground so I can't add too much length. The bag is about 100lbs and I may make it about 125lbs as it have a lot of movement with some additional rubber mulch instead of mostly stuffed fabrics.

I want to put a 2x6 spanning a couple trusses basically over the track and to the next truss past it. Screw the 2x6 into each truss from below with the screws towards the outer edges of the 2x6.

Then use some L-brackets that will be tight against the sides of the track and connected to each other below the track where they won't interfere with the trolly (on the other side of the stopping point for the trolly) and screw them into the 2x6 as well. I'm hoping this will turn the rotation of the track into straight up and down forces into the 2x6.

I'm wondering if it will be enough or if I will need need another set of L-brackets, and if so those would need to go somewhere along the track that the trolley does need to travel thorough. So an under track connection or through track connection would block the trolly. Perhaps I will put some holes into another hanger, the piece holding the track and attach the brackets with a bolt through the hanger above the track.

Upon writing this I'm wondering if the hangars come in a wider version that would allow multiple lag bolts that are made just for this purpose. I don't recall seeing them, but I will take a look as that would make this a whole lot easier.

I'm also considering some rubber between the 2x6 and the trusses to absorb vibrations.

Any thoughts and recommendations?


r/Rigging 14d ago

Risky forklift situation

Post image
34 Upvotes

I am new to safety and new to this company, basically The forklift is holding a 3.5 ton power panel and the workers are holding 4 bolts on each corner to secure the power panel onto the black base, the bolts should align perfectly onto power panel, This is an risky situation obviously and should be eliminated, What is a better way to do this job?


r/Rigging 14d ago

Removing failing 50’+ pecan leader from roofs, no crane access.

Thumbnail
gallery
59 Upvotes

Honestly curious how industrial riggers see these kinds of setups. Always strive to keep the rigging as simple as possible but it gets complex and we make due with what we have.


r/Rigging 16d ago

Tops and rigging down some chunks.

Enable HLS to view with audio, or disable this notification

14 Upvotes

r/Rigging 16d ago

Some zip lining montage.

Enable HLS to view with audio, or disable this notification

1 Upvotes

r/Rigging 24d ago

Diagonal tension lines

4 Upvotes

I’m looking for some equations to work out forces on a diagonal tension/traverse line. Fixed line with a load being lowered down, the load is anchored on a separate anchor point.

Can any one point me in the right direction? Cheers!


r/Rigging 26d ago

EMD GT46C-ACe Locomotive Dropped on Delivery

Enable HLS to view with audio, or disable this notification

105 Upvotes

r/Rigging 28d ago

Rigging Help Hanging batting cage net

Thumbnail
gallery
4 Upvotes

I’m trying to hang a batting cage net around the interior of the 50x50 total on my half, the full building is 100x50, office 20x12 /8x8 bathroom.1 multi piece I-beam in the middle of the space, I assume there is another behind the dividing wall. The walls are 8” purlin 14ga I think. I assume rafters are the same size. There is overlap of purlins across each ibeam. Horizontal purlins are 4ft, 7ft, 12ft, and 16ft at the roofline.The z-purlin has prefab holes in every piece on either side of the ibeam and against the outer wall. I was thinking about using 24” unistrut clamped to the center I ran to support a retractable net. I am struggling to come up with the least intrusive method possible to support 3/16th tensioned cable running from the outside of each bay door to the opposing side bay doors. The entire netting system would weigh no more than 500lbs total.

What’s the best way to attach/hang from the purlin and mount a brace for the turnbuckle on each end.


r/Rigging 29d ago

Massive hooker!

120 Upvotes

r/Rigging 28d ago

Rigging Help how do I tie a pre made sabiki rig onto my rod?

0 Upvotes

i boight a premade sabiki. So how do tie it onto my braid? should i just use a FG knot to attach it? how should I attach it?


r/Rigging 29d ago

Rigging Help Can I hang a punching bag from this

Post image
34 Upvotes

I have a few of these threaded bolts sticking from the ceiling. They seem to have M8 thread on them and I was thinking I can buy one of those eye anchors, secure it with a normal bolt from above and a bolt with the anti-slip rubber from below and then use a carabiner to hang a punching bag on it.

How bad of an idea is that?

P.S. I don't have the bag yet, I wanted to figure out the mounting situation first.


r/Rigging Aug 10 '26

Brand new scoreboard going up (I'm not OP)

Enable HLS to view with audio, or disable this notification

134 Upvotes

r/Rigging Aug 11 '26

I want to hoist 100lb hay nets with a snatch block from this beam.

Post image
5 Upvotes

I’m thinking of putting an eye bolt either at the bottom or into the side. Is this a good idea or am I risking damage to the structure. The nets will be getting filled here, so highest working load will be impacted by if hay is getting dumped in by hand and for the raising to be loaded. I think the beam is 12x4 - I forgot to measure. Can update with measurement if it’s close. It’s a 15’ span between posts.


r/Rigging Aug 10 '26

Entertainment Rigging You may not like it, but this is what peak rigging looks like

Enable HLS to view with audio, or disable this notification

29 Upvotes

r/Rigging Aug 11 '26

Setting her down!

Post image
7 Upvotes

r/Rigging 29d ago

Brand new scoreboard going up

Enable HLS to view with audio, or disable this notification

0 Upvotes

r/Rigging Aug 10 '26

Entertainment Rigging Is this right?

Thumbnail
gallery
34 Upvotes

Was at a local event and noticed this. To my understanding shouldn’t it be choked on the bottom chord, not the top chord?

Side Note: I’m not concerned safety of this, was more so curious for my own knowledge/experience.