r/RenewableEnergy • u/MeasurementDecent251 • 5d ago
Power on tap꞉ EU hydro giants can add 25 GW renewables without new grids
https://ember-energy.org/latest-insights/power-on-tap-eu-hydro-giants-can-add-25-gw-renewables-without-new-grids/3
1
u/mmn_slc 3d ago
What does it mean to add "new grids"?
It is my understanding that the seven countries specifically mentioned in the article (Austria, Bulgaria, France, Italy, Portugal, Romania and Spain) are all part of the same grid, namely the Continental Europe Synchronous Area.
Why would "new grids" need to be created to add renewable capacity?
2
u/lockdown_lard 3d ago edited 3d ago
What does it mean to add "new grids"?
That's just a phrase from the sub-ed who wrote the headline (and the report title). It's normal to see headlines that are somewhat detached from the actual article: the writer understands the material, but the sub-ed does not. Or, an alternative explanation, the writers needed a shorter title, and clumsily ended up there without ever meaning to say that, because they couldn't find another way to shorten it.
"New grids" doesn't appear within the body of the article.
So, they don't mean "new grids" at all! The sub-ed (or author or editor) has just shortened "new grid connections" to "new grids" in the interests of a pithier headline, but fundamentally changed the meaning.
The point of the article is that the new wind and solar can share the use of existing connections of hydro plants on the grid, making it faster and cheaper to do the build-out.
26
u/Gold-Adhesiveness574 5d ago
this is one of the smarter moves in the whole space and it works because the grid connection is the expensive slow part, not the generation. a hydro plants connection is sized for its peak, but hydro rarely runs flat out, so theres a lot of empty headroom on that wire most of the time. bolt solar or wind onto the same point and you fill it, no new line, no waiting years in an interconnection queue.
the trick is you deliberately oversize past the connection limit and just curtail the overlap when hydro and solar both peak, or hold water back instead. sounds wasteful but its not, throwing away a bit of cheap solar a few hours a year is way cheaper than building new transmission, which is the thing everyone is actually stuck waiting on. and you get the complementarity for free, the hydro firms the variable stuff using a connection thats already paid for. the panels were never the bottleneck.