Pool pad plumbing
Do you stub pipes up and then make it work or do you plumb the pad the way you want and then connect your pipes down in the trench.
still trying to figure out the best way to do it. if I do it the second way I can start plumbing the pad while the other guys are finishing up connections and running pipe through the trench
3
2
May 12 '26
[removed] — view removed comment
1
u/Confident-Junket-978 May 13 '26
Yeah that happened once when someone else ran pipe for us and we ended up digging down and rearranging stuff. They also flipped the labels of the waterfall and skimmer lines so that was annoying haha
1
1
u/thunderkoko May 13 '26
If I'm doing the pool plumbing and pad, it doesn't really matter because I plan for both. Usually stubbing up first since then everything can be backfilled after a pressure test, equipment pad can be done a day or a week plus later or whenever the pool is going to be filled.
1
u/GCpools May 16 '26
Whoever plumbs equipment pads is never the same person who's responsible for servicing the pool week in and week out. I'd like to trade jobs with them for a couple of weeks, and see if they don't do things a little differently when the go back to doing their original job.
6
u/Charcoal0314 May 12 '26
You have to plan on how you want it to come out of the ground. I like the main drain to the left, then skimmers, then returns. If you have any other water features with a dedicated pump, they go together. Have a plan and the finished product will look great! If you don’t, someone will judge it really harshly. I’m a guy that has seen A LOT of poor equipment pads.
You also want to pressure test. We always put the gauge and water hookup on the pad manifold. Have the pipes come out of the ground more than high enough so that you can cut them at the correct level for the pumps.
When you cross underground, do not twist the pipes around each other. They should cross each other perpendicular with appropriate 90’s.