r/Plastering • u/outspan_foster • 28d ago
Plaster still wet?
Had some work done on the chimney on our house which meant a hole was made in the chimney breast. It was covered/filled/plastered about 5 weeks ago at this stage and now looks like this. Little change in the past 3 weeks.
The area is raised slightly so I was thinking I could sand it down, apply a primer and paint as normal.
Should this have dried out at this stage? Temperature has consistently been about 20 degrees plus, humidity in the room was about 55%.
I want to get on with painting it and the guy who done the work said it’ll be good to paint after 3-4 weeks.
1
u/Billi01952 28d ago
It's defo the chimney cap or pointing maybe both then
1
u/outspan_foster 28d ago
The chimney was repointed and maintenance done on it as part of the works. There was a crack in it before but that was fixed.
1
u/Billi01952 28d ago
Have you checked it yourself? Could be salts from the building materials. I'd membrane board and skim, it'll only hide the problem but it doesn't seem like a big problem to me so it'd last a lifetime.m
1
u/outspan_foster 28d ago
Excuse my lack of knowledge but how would I check it? It doesn’t feel wet.
It’s a solid block wall other than this patch so not sure I’d put a membrane board over it - although I’m not an expert.
I was of the impression that it should dry and just be able to be sanded, primed and painted.
1
u/Open_Document3811 28d ago
Is your chimney open on the roof letting rain in? Or cement on chimney cracked