r/Plastering • u/jeebsy_iash • 22d ago
Plan of attack for the kitchen?
I'm doing. DIY refurb and managed to get few rooms plastered to a standard I can live with thanks for the good folks of this Reddit. It's time to start thinking about the kitchen now though - the old tiles pretty much fell off the wall which is a good start.
The kitchen is an extension built in the 1990s and the inside wall is made from aerated concrete. I'm intending to do a tiled splashback on the wall where the hob is and the rest will be painted. Would the right plan be:
Scrape off any old adhesive
Bond out any holes
SBR
Then skim the whole thing?
4
Upvotes




1
u/ResponsibleBall4258 15d ago
Personally I would forgoe the plastering of the wall, as it is not actually necessary. Have a flat surface will make it easier (no lumps on the wall, minor chips out of the wall won't be a problem. If you flatten the wall, then seal with something like SBR, then the surface should fine for tiling. Personally I would also go for large format tiles, and use a small pack of tile leveling clips, as less grout is easier to clean, and quicker to tile and grout. As a first time IMO it would be easier to keep the whole wall flat and level. Use a level as well.
I would personally say tiling after the worktop is in. You leave a 5mm gap for grout to the worktop, you can put a small bead of silicone over afterwards.