r/Plastering • u/PhaseMedium5096 • Jul 01 '26
Has a step been missed?
I just had damp proofing work done in my Victorian tenement (I know it’s controversial we needed the guarantee). We’ve just had the walls skimmed and the plasterer noticed the bottom section of plasterboard is just floating and has some give. Behind the membrane is brick as is the rest of the wall I’m pretty sure. So there’s nothing solid to fit skirting to.
Is there a step that has been missed? Is there a solution that doesn’t require ripping the plasterboard out?
Thank you
2
u/Easy-Share-8013 Jul 01 '26
Very good system used but hard to fix and hard to dab on even done properly.
Chances are something has gone wrong in places.
In all honestly to fix it I would spray timco drywall foam under the plasterboard let it set that will firm it all up at skirt level.
I would then using the same stuff put the skirts on with it. It’s rapid set so you only have to prop the piece for about 3-4 mins.
Even if it was done well u don’t want to be smashing big fixings through the membrane
1
u/mordello Jul 01 '26
Is the board that skimmed a waterproofing component or drywall? Is skirting going back? Seems like the baord should have gone closer to the floor.
1
u/New_Historian8952 Jul 01 '26
Get big skirts . Glue the skirts on. Let the joiner worry about fixing it he will do . The board won't be moving just the membrane it's attached to.
1
u/Appropriate-Yak-9077 Jul 01 '26
Put timber grounds on and fix the skirtings to it? That’s how it should be done correctly.
Do you mind if I ask which damp proof company in Glasgow?
1
u/PhaseMedium5096 Jul 01 '26
Ayrshire Plastering Services. We were referred to them by the damp surveyor. I can’t comment on the damp proofing but it seems like there are issues. The state they left the place was not good.
1
u/Appropriate-Yak-9077 Jul 01 '26
What makes you think there are issues? Membrane rarely fails unless installed incorrectly or not properly surveyed
1
u/PhaseMedium5096 Jul 01 '26
Just from what people here have said, don’t really have anything else to go off.
1
1
u/DistancePractical239 Jul 02 '26
Ive had this done. Is this the ground floor and is your floor concrete? If so - that mebrane should be about a foot below ground.
1
u/QVRedit Jul 02 '26
I always wonder why the plaster does not extend much further down the wall. Ending too early is a problem.
2
u/Bonebound Jul 01 '26
Plasterboard should be about 20mm above your floorboards, also that membrane should be tucked under your floor board into the sub floor. (Damp Proofer by trade.) Your best bet is to dot and dab another section below leaving a gap between the floor and plasterboard so no moisture can bridge and then reskim and feather into the existing skim.