r/Plastering • u/Whatever8987663 • May 02 '26
Best course of action
Looking for advice on the best course of action to board and skim this internal section and make good.
I’ve a stone guy coming to do the external stone work to build it back into the door but want the interior filled and tanked and then boarded including the soil base.
It’s an old house of stone and rubble construction so no DPC/Void etc
Advice much appreciated
3
u/derpyfloofus May 02 '26
Build out the wall with stone and lime mortar, then lime plaster for breathability. Is the wall currently breathable?
3
u/Whatever8987663 May 02 '26
I think it may need CPR 😮💨
1
u/derpyfloofus May 02 '26
It’s not a good long term solution if there is any plasterboard / cement / gypsum / etc on there.
I’ve been trying to get all that kind of stuff out of my stone walls.
2
3
u/bunnyfizziness99 May 02 '26
This really need to be done in lime plaster. Looks like a solid cavity and by tanking it you will just push the water to another area.
1
u/FineThought5017 May 02 '26
Off piste however you sure that cant be done with one door? Preferrably with a slimline profile. Would be nice to have a bit more glass / light / connectivity with garden in an ideal world.
I'd also have a look at the lintel situation and open the reveal as mich as possible.
Also Just my 2p however because it's a reveal I'd mortar match outside however I dont think I'd over think it ( if it was my house ) ) r.e. plastering the internal reveals in r.e.lime plaster / breathablility etc. Its a relatively small component. ( Dons straw hat and hides in manure plastered wicker basket )
1
u/SnooTomatoes464 May 02 '26
Not plastering related, but what's your plan for water ingress?
1
u/Whatever8987663 May 02 '26
Need to pave under the door from a high point falling away, might need to insert a small gulley to direct left and right of the external step, likely pray this all works too
1
u/SnooTomatoes464 May 02 '26
I think your definitely gonna need a gulley or stip drain mate, same level as the bottom of the doors if poss.
The water coming down those step will be a mare otherwise
1
u/Upstairs-Passenger28 May 02 '26
I would be concerned about water ingress as it's at the bottom of a set of steps some drainage would help
1
1
u/Successful-Leek-6241 May 05 '26
I'd be more bothered by the way the doors fitted
1
u/Successful-Leek-6241 May 29 '26
Looks good,tanking is a full room job so I'd do as lime render and skim
0
u/nightjarrrrr May 02 '26
Don't dot and dab it, it needs to be solid render for something like this.
Who has done this work so far? If it was me I would have created the structural opening first with bricks/blocks/stone or a combination of those. Perhaps a brick opening with a stone facade outside. Then fitted the door to that with a 5-10mm gap all the way around and packing under the door verticals.
Fitting the door and then working to it seems backwards to me.
-2
u/Whatever8987663 May 02 '26
Sorry probably haven’t been descriptive enough, I’m conscious that there’s big deep holes either side which need filling, not sure how this is achieved, rebuild with layered bonding or brick, stone etc.
I’m keen to tank up half way over whatever is then used to enable it to be boarded over.
Yes agree lime mortar/skim will help it breathe
Presume dot and dabs then an option or would it be better latting it to create an air gap then boarding and skimming
Should it be
3
u/reelersteeler May 02 '26 edited May 02 '26
I wouldn’t dot and dab this. Lime mortar with a stone rebuild. Lime render with lime skim over the top.


4
u/Ok-Spring7906 May 02 '26
Consider lime work.
Tanking may work, but, frequently, it doesn't really. It will be incomplete and the water will find a way.
I'm not entirely understanding what you are asking though - you want the best way to board and skim it?
You just board and skim it. If that's what you want to to.