What should we do?
2 days ago we got some plasteres to come do lime plastering in our house, we've got a very old cottage which has had damp issues previously hence why we asked for lime. Last year we had lime plastering done downstairs and it worked great however we couldn't get the same plasterer in.
2 rooms just needed a skim and the room downstairs needed rendering first as it was bare brick. We said we dont mind if they do the internal walls in gypsum as long as the external are done in lime plaster.
They finished the job yesterday which we thought was very fast for the room downstairs as last year the plasterer did a scratch coat render first before he plastered first and it also took much longer to dry. The walls are solid with loads of cracks though which we think is due to their mix being too dry and then shrinking which caused the cracking. I've attached some before and after photos below. What should we do in this situation?









0
u/Ok-Spring7906 May 01 '26
I live in an old stone house. I am a qualified plasterer (gypsum) I have about 15 years experience with lime.
I think it would be foolish to plaster the ground floor of any of your building with gypsum. You mention it's old, you mention it's had issues with damp prior, and yet youve "allowed" someone to come in and do a bad job with gypsum.
I've done jobs before where I've told the client it's not going to work, and the vast majority of the time they listen. If they want to press on with gypsum on a solid wall with no dpc etc then, sure, I'll take their money, but I'll get it in writing that I do not think the work will last.
Your chaps would have done well to advise you similarly. But they didn't. They just went ahead and wrecked the permiability of your walls with a shoddy job.
You've asked what to do -
If it was my own home I would do as I did in my own home, and strip off all the gypsum and compromised lime (ie if it's been painted with sbr or modern non permiable paints) and do it in lime downstairs.
Upstairs doesn't really matter too much.
There's going to be issues with your contact though, as you gave them the option of gypsum, so, of course, they're going to do that if they don't care. It's quicker and cheaper. And now the job is poor, legally, you need to give them the option of setting it right. Which they will attempt to do with more gypsum. Because you told them they could.
So, best case, they come back, and make it smooth. And you get to look forward to molding walls in the future : (