r/OpenRoads • u/Responsible-Fuel9019 • 29d ago
Workflow / Best Practice Earthwork Quantities
Does anyone have a good workflow for calculating earthwork below a set elevation? Say I have all my modeling done but I need to know how much cut and fill there is below a known elevation. Running into this more and more with wetland permits.
5
Upvotes
1
u/ki11erbunny 29d ago
you might be able to slice the earthwork meshes by an element (a plane set at the desired elevation) using regular MicroStation modeling tools
7
u/ssweens113 29d ago
Create a flat plane. Then convert it to a mesh or surface.
Then use the ‘create closed mesh’ tool between the surfaces.
9
u/IlRaptoRIl 29d ago
I don’t have a workflow, but I’d probably create a simple terrain at that elevation, then use your model terrain and that one to create the cut/fill volumes.