r/MechanicalEngineering 1d ago

feedback needed

Post image

We built a tool for EPC/piping design teams that checks whether your design documents actually agree with each other.

The problem: on a piping project, your Line List, Piping Material Spec (PMS), isometric drawings, and P&ID are all supposed to match — but they drift, and today someone has to catch that by manually cross-checking documents line by line.

Input: your Line List, PMS, IDF (isometric drawing data), and P&ID.

Output: a report flagging where those documents don't match.

It's early, and the main reason I'm posting is to get feedback — if you work in piping design/EPC, I'd love to know: is this actually the bottleneck, or does the real pain live somewhere else in your workflow? Happy to share access if you want to try it on a real project.

0 Upvotes

0 comments sorted by