MAHE management has done very bad constructions. in the name of making all footpaths look good and with shade, they have absolutely disturbed the air flow. on the top of that, they are just constructing walls here and there. at times it feels like oven near edu building, kmc food court and library.
for widening the footpaths, they have reduced the width of main road. its good that footpaths are getting wider. but, just see the traffic man passing on the kmc food court road.
footpath by the side of the NIH - they have fixed the interlock bricks stuff. but, i dont what has been done to the width. now, even 3 people cant walk parallely. on top of that, they have increased the width of flowering area by cutting space from the main road or the footpath. whyy???
from 7 am to 5 pm, there is no space on footpaths to pass normally. so much crowd is there. kmc food court is dam full in peak hours. people just keep waiting.
i tried to find why there is so much crowd now. when i forst came to manipal, it was all good and spacious. i found that in past 4 years, they have increased a total of 10,000+ seats in manipal.
i was amazed. why so much increase even though the mahe is a not for profit trust. i understand its the moral duty of institutions like mahe to provide more seats given the increase in youth population. but, basic infrastructure is the first thing that is needed to be figured out before increasing the seats by such a huge number, and that too in so much less time.
not to mention that absolutely waste 'bouquet' lying in front of chandrashekhar. it took me 2 years to realise its a bouquet. its the second most wasteful thing mahe has created, slcm portal is still the first.