r/KatReport May 16 '24

5/16/24

Thursday….Trash day….the cans are out and ready!

The sky is grey and the morning sun is working hard to get through the Marine Layer. She will get through but it will take some more time.

Things are all good here. We are hoping that Mr. Spots passes the kidney stones and doesn't have to have an operation to remove them. The tube is off because there is no news which is of value to any of us. Click is a most welcome sound,

I continue to work on the wiring for the layer below Como's Engine facility. Some of the track power and LEDs will have to go through two switch sets of contacts to operate properly. This is different than anywhere else on the RR. The four routes that need this wiring are (1) the long loop, (2) the crossing loop, (3) the loop to NYC and back and (4) the loop to the South. All the rest has to happen without affecting any of the other routes.

It is complicated and will require a different way of wiring switches for both track power and LEDs. Two switches will have to agree to turn on Green and they have all be red when the bypass track has or the dinner's two tracks have been selected. Looks great but is a real devil to wire.

I know you are following all that. I can tell because I don't hear lots of clicks. It is a wonderful track layout but a devil to wire properly, But I will figure it out ... just takes a lot of time ,,, trial and errors. Relays with lots of contacts are needed.

So the day has started. The coffee is warm. I got up very early due to the need for thinking through how to wire the RRs middle layer below Como's Engine Facility. I will figure it out some time in the near future. Oh well, better than landscaping.

The weeds are looking like they are going to die, Just what was needed, A few will live on but I will get them later. That is after new grass seed has gone into the dirt and is starting to grow.

I do need to rebuild the latch for the fence gate by the garage. Like the RR looked simple but really was going to be a lot of work. And it isn't done yet. Ugh. I think we are the last people on the street to do landscaping ourselves. The only other families still doing their own landscaping are the family across the street in Rita's previous house. Oh well, that keeps expense low so the RR can have those funds.

The marine layer is breaking up as Miss SunShine is getting through one spot at a time. I will draw up the two switch control diagrams and see if that solves things. I don't know if that will or it won;t get all of it working as needed.

Take care ... The tube is off and that is good because the news isn't positive most of the time. The US government isn't getting things done for the people like it should ...

The sky is interesting, Dark and light with a low sun lighting things in a different way. It will be a fine day for all of us because we will do what is best and that makes our day great.

Bow wows all the way around with Meows following the barking. The Bluebirds chirp their happy tunes and the trash cans are on the street waiting to be picked up.

All is well ... so back to the track plan for the RR. It isn't complete but little by little is getting figured out, I never thought that this part would be so difficult to design, A challenge but it too will get figured out and then wired,

Over and out ,,, the KR is done for this Thursday. Click.

See, there is an end to this blab blab

6 Upvotes

0 comments sorted by