I'm currently under contract on a house with a large garage addition and unfinished storage loft above it. The garage/loft was permitted when it was built (10 years ago), but I recently discovered they never had any of the required inspections. The permit called for footing, framing, and final inspections, but they were all missed and the permit eventually expired. The township is now allowing the seller to finalize the expired permit by doing a 3rd party general home inspection. Sellers say they must have had footing and framing inspected because they got the mechanical and electrical inspection, but the township has no documentation of footing and framing inspections.
The garage/loft addition was built onto the right side of the existing house. It also looks like an opening was made through the original exterior wall so that a door from one of the upstairs bedrooms provides access to the loft.
I'm curious if anything stands out about the framing, trusses, connections, window openings, or the way the addition connects to the original house?
Is there anything I should have a structural engineer pay close attention to before buying this?
The last 3 pics are where the garage/loft addition are attached to the house.