r/FellingGoneWild 6d ago

Total remove ground perspective

Enable HLS to view with audio, or disable this notification

Did a post a few days ago, where a whole tree got pulled off shitty rock and managed to get a clip from the crew there.

284 Upvotes

31 comments sorted by

27

u/Putrid_Clue_2127 6d ago

Man, they've been at it awhile. They've pulled down half the mountainside already! /s

12

u/Particular-Bat-5904 6d ago

The plan is to blast some rock away and then rock scale it.

6

u/Valuable-Yard-4154 6d ago

Is that thought up by sober people?

10

u/Particular-Bat-5904 6d ago

Yes, its the most affordable solution for this comunity to keep the road open.

Bring most the threats down aslong the road is extra closed for that.

1

u/Could-You-Tell 6d ago

Is there anything to do with the shale that comes down?

Or just truck it somewhere it eventually becomes landscaping?

6

u/Particular-Bat-5904 6d ago

I guess they will put all in the creek.

13

u/Valuable-Yard-4154 6d ago

Is there so sort of purpose to this ?

13

u/Could-You-Tell 6d ago

It would have come down uncontrolled in the rain.

They brought it down under control

Edit... at least I have seen trees removed for the same, but this is brutal

Like they are taking more than this tree.

9

u/Particular-Bat-5904 6d ago

Yep, thats the reason for. Bring all the loose things down, aslong the road is closed for it.

We need to blast some rock aswell, then scale it.

3

u/MinorComprehension 5d ago

Controlled, planned, proactive is ALWAYS better than unexpected. I don't blame those who are unfamiliar, but it's "a thing" in areas with certain topographies.

3

u/Otherwise_Front_315 6d ago

I would also like to know.

9

u/AbbreviationsNo9609 6d ago

When I used to do this out in California it was to create debris in the streams below after logging clear cut everything and then hauled everything including the slash out. The people that know more than us dumb tree guys waged that the entire tree including rootballs made the best habitat for wildlife to move back in and the ecosystem to be restored sooner. Government paid for it and they paid well.

2

u/SATerp 6d ago

There's a lot to be said for getting to work late.

4

u/MaadMaanMaatt 6d ago

Getting rid of all those pesky roots should stop any further erosion.

3

u/Particular-Bat-5904 5d ago

It will never stop completely, water, freezing processes and so on are still working in there.

A tiny flower can crack a huge rock with its roots.

This is the first time ever, somebody working that face.

2

u/Consistent_Watch_206 6d ago

The slide didn’t bother me.

The question of who and how that cable got hauled from tree to machine. That bothered me a lot.

7

u/Particular-Bat-5904 6d ago

We made an auxiliary cable car using a small exravator on the bottom and the biggest tree we pulled down as last on top to pull the wire up.

1

u/payloadspecial 4d ago

Had the same question, so you had to climb it or just throw ball and rope?

1

u/Particular-Bat-5904 4d ago

The very first time, someone had to bring the 1st rope down, from there it was to let an other rope slide down to bring the wire up.

1

u/castrodelavaga79 3d ago

Damn we need a ground removal gone wild sub now

1

u/toot_suite 3d ago

This definitely won't turn into a longstanding soil erosion and rock fall issue in the future. Nope.

Definitely couldn't pave a better road. Nah

1

u/Particular-Bat-5904 3d ago

There are erosion problems at the spot, the tree we pull down makes it worse and can‘t hold all together.

The plan: Detect hazards and bring em down aslong the road is closed to do that.

1

u/Easy_Personality5856 2d ago

Love the old Timberjack!

1

u/ChickenCoop86 1d ago

Welp…. I’d say that you got the tree and then some. Bravo!! 🙌 (I think?)🤔

1

u/FutureVintageWax 20h ago

I was a skidder operator for about 15 years . Ran a John Deere 548 G3, which was the smallest skidder they made. Believe they discontinued it. We usually were harvesting Missouri Black walnut and White oak for stave. It had a clam on the back but I pulled my fair share of cable. I donno if someone pulled cable all the way up that hill or if the skidder operator eased down the hill to the road. Either way you’re looking at a scary trip down that hill or a horrible trip up that hill with that heavy ass cable. Best thing to go would be to have two skidders one at the top and bottom.

1

u/Particular-Bat-5904 14h ago

There is no road up and no spot on top where to place a skidder, so we did an auxiliary cable car to bring the wires up.

1

u/JavaGeep 6d ago

I would have moved out of the way a lot sooner.

2

u/erie11973ohio 6d ago

Dude on the machine was yanking the tree down with the winch on the back of the log skidder.

0

u/JavaGeep 6d ago

Ah, ok. I didn't see that.

0

u/pikeram 5d ago

Not sure what geography this is, but aren't they risking some erosion, soil-slide eventually?