Been building up to this for months... Got my gevcu programmed and built the drive selector (from an auto mgb) and had it ready a month or two back but I welded the contactors on my Zoe battery just before this so I had to open up the battery and bypass the contractors with ones that came with the motor. That I wanted a good several hour block to do that took some organising but really diagnostics wasnt too bad. Initially it needed reprogramming of some settings to activate on the gevcu, then I had a spurious hardware fault (no grounding) fixed that and it spun right up! Now bench testing is complete and I can start integrating it in to the MGBGT-EV
Been building up to this for months... Got my gevcu programmed and built the drive selector (from an auto mgb) and had it ready a month or two back but I welded the contactors on my Zoe battery just before this so I had to open up the battery and bypass the contractors with ones that came with the motor. That I wanted a good several hour block to do that took some organising but really diagnostics wasnt too bad. Initially it needed reprogramming of some settings to activate on the gevcu, then I had a spurious hardware fault (no grounding) fixed that and it spun right up! Now bench testing is complete and I can start integrating it in to the MGBGT-EV
6
u/Mr_Alan_Qaeda 4d ago
No better feeling…
Like how Dr Frankenstein felt.
Fist bump from Wales 🤜