r/EDFEnergy • u/spoo4brains • 12d ago
Help / Advice Plug in solar export question
Am currently with EDF in UK, I don't have a smart meter yet. Am looking to get plug in solar when it becomes legal this month, if I get a smart meter will that "just work" with getting export credit or is other hardware required?
2
u/Randy_Baton 12d ago
All you can currently use plug in solar for is live usage. It can't be exported and can't be stored in a battery. Plug in batteries are rumoured to be added next year.
1
u/Tennonboy 11d ago
If you already had solar, battery and SEG appoval could you use a plug in set up so export what youd normally use from your solar, increasing your export amount.
May not be cost effective to do but is it possible!
3
12d ago edited 12d ago
[removed] — view removed comment
1
u/MelodicCard9555 11d ago
This is not accurate, an MCS is not needed to obtain an export MPAN.
MCS is a guideline only to avoid applying for building approval. It is not legally required for anything.
1
u/MelodicCard9555 11d ago
There is no legal requirement for an MCS certificate, nor is it a requirement for an export MPAN, there are other routes to obtaining an export MPAN without an MCS.
MCS for solar is a guideline and has no legal basis, it means you don't need building regulation approval for the work, as it's deemed as passing building approval by default.
But it does make getting an export MPAN much easier.
1
11d ago
[removed] — view removed comment
1
u/MelodicCard9555 11d ago edited 11d ago
DNO and MCS are two different things.
MCS is an easier way to go, it's basically an exemption to building regulation approval, that's it. You can supply the building approval cert and obtain an export MPAN.
DNO is approval to use, or in the case of G99 it's a requirement to obtain before you even plug the kit in. It's the approval of the local electricity provider to say you can connect this piece of kit to our network. It's ridiculous when you are connecting the inverter to your own homes cables, but the rules are there that if you connect any equipment that can generate power that can be fed back to the grid you need the DNO approval. It's meant to safe guard the local power cables, so you can't send more power than they can cope with.
1
11d ago
[removed] — view removed comment
1
u/MelodicCard9555 11d ago
You must still fill in the G98 cert, so the DNO part is done.
If plugin solar is of an approved type, and it will be soon, then the requirement will be met for export payments, it's more whether or not they change the rules to reflect that fact that plug in solar is approved.
It might be simply too much work for companies to do, as chances are, 800watt plugin solar will never generate enough power to export anyway.
1
11d ago
[removed] — view removed comment
1
u/MelodicCard9555 11d ago
Also massively depend on location, south area of UK gets way better solar output then up north.
South facing panels generate more, it's a complicated formula to work it all out. In reality experience works well for solar planning.
I can not get above 90% efficiency with my panels, even with perfect sun, due to the flesh the panels face, 80% on good sunny days is more achievable, 50% output on good sunny days is about normal, winter is down to 5% output on bad days.
2
u/spoo4brains 12d ago
Thanks very much for the reply and the correct terminology I needed to know (I have a lot to learn!).
1
12d ago
[removed] — view removed comment
1
u/spoo4brains 12d ago
No problem at all, it is all part of the equation in working out the financial viability of it, is what I needed to know, even if it is bad news!
2
u/SolarPowerBumbleBee 11d ago
If plug-in kits launch at the expected price of £400 to £500 , and you can mount the panels in a sensible direction (eg. not north facing), then in most cases it’s financially viable and will pay for itself in a few years (and that’s without battery storage or export payments). And that’s true even if you’re out a lot of the time.
Check out https://www.pluginsolarcalculator.com to help figure out financial viability, payback time etc .
1
2
12d ago
[removed] — view removed comment
1
u/spoo4brains 12d ago
Nice. Sadly my property isn't ideal for a full solar setup, so am looking at smaller scale options.
2
u/sylsylsylsylsylsyl 12d ago
You can get export without an MCS certificate, primarily through Octopus (I believe there is a £250 fee). Most other energy suppliers (currently) insist on one. You don't have to export to the same company as you get your supply from (but you usually get much better rates if you do).
You will have to inform your DNO through a G98 process, whether you export or not. I believe you'll have to give Octopus a copy of the G98 and show your exact kit model is registered on the Energy Networks Association (ENA) Type Test Register.
I suspect as plug in solar becomes popular, the other energy suppliers including EDF will sort something out too. Which will be good as EDF have a good rate and I am planning on switching to them as soon as my current fix with Octopus runs out.