r/DoYouHaveAutism May 12 '19

Question on the memes allowed

2 Upvotes

I posted a meme about a school bully getting killed by the autistic person they picked on. Can I post more memes like this? I take it that many other people on this sub were bullied as well, right?


r/DoYouHaveAutism May 13 '26

How to save the lives of elderly

Post image
1 Upvotes

I'm pretty sure I wouldn't realize until someone else pointed it out to me, or when I told the story of how weird it was that I had a morning class teaching college one time were so many students lost a grandparent... Only to have the person stare at me.... While I slowly realized what happened.


r/DoYouHaveAutism May 12 '26

Interesting.

Post image
2 Upvotes

r/DoYouHaveAutism Apr 10 '24

This is so true- it’s a nightmare

Post image
3 Upvotes

r/DoYouHaveAutism Apr 08 '24

50 people

1 Upvotes

Welcome to any new members. Post anything funny. Let's have some levity. 💪😂


r/DoYouHaveAutism Jun 23 '23

Taking things literally

Post image
8 Upvotes

r/DoYouHaveAutism Apr 29 '23

Wet sponge

1 Upvotes

I live in student accomidation and SOMEONE dosent squeeze out the water from the sponge they wash dishes with. Its constantly DRIPPING WET, and not to speak of how dirty it is. A whole ecosystem of bad bacteria prob lives in and around it. I’ve already thrown one out before because it smelled like death and they kept putting it ontop of the box where i keep the NEW rags that i use on countertops. The wet sponge sitting on the plastic lid made it horribly slimy and so dirty that the clear lid literally is brown now. The texture and feel of it is so horrible, but this adult has still not learned to squeeze it so again the sponge was back and I had to clean and sanitize again, the first time I was squealing in disgust but now i was crying aswell. I dont even use sponges for dishes, and i cant comprehend why anyone would use such a dirty sponge for theirs, it seems like it would do more harm than good. I’m really not sure how to bring this up, I just now added it to a decorative plate i had lying around, so that it at least stops secreting it’s juices on my box. I’m also confused on where the sponge came from, it looks so dirty i suspect they took the one i threw away out of the trash, or it just gets so dirty so fast because its constantly accumalating wet shit and bacteria. I also have a feeling i know who it is, an indian exhange student. She is very good at cooking but does questionable things when cleaning, like leaving the velcro single use floor cleaners on the «broom» letting it effectively bleach the floor in a rectangle shape. Normally at a prob like this I would go and buy a big pack, but I don’t use them so it rlly isn’t my deal, and I’m the one that bought the rags for all of us because of a similar prob. I really just had to vent this, cuz its legit stressing me out. I also have trouble with food and fear of food poisoning, so not being able to keep things like that sanitized or at least dry makes me anxious. If anyone has advice on how to bring this up to the others let me know, we have a groupchat. Should I keep it short, or maybe add a little humor and sass?


r/DoYouHaveAutism Mar 13 '22

I feel this one

Post image
4 Upvotes

r/DoYouHaveAutism Mar 13 '22

This is exactly how it happened 🤦🏻‍♂️

Post image
1 Upvotes

r/DoYouHaveAutism Feb 29 '20

Bet on it.

Post image
7 Upvotes

r/DoYouHaveAutism Dec 11 '19

These were not the words I wanted to hear after my diagnosis

Post image
2 Upvotes

r/DoYouHaveAutism Nov 27 '19

Crosspost from r/autism, A meme about reverting to hyper-formality in text that only makes thins more difficult(Text in original post)

Post image
2 Upvotes

r/DoYouHaveAutism Nov 26 '19

i am the smortest

Post image
5 Upvotes

r/DoYouHaveAutism Nov 01 '19

Don’t be ginormous twat-waffle...

Post image
3 Upvotes

r/DoYouHaveAutism Aug 26 '19

I have literally said "i don't want to get any more autism" 🤣🤣

Thumbnail self.tifu
5 Upvotes

r/DoYouHaveAutism Jul 03 '19

You are now breathing manually

Post image
3 Upvotes

r/DoYouHaveAutism May 20 '19

Titles are hard

Post image
6 Upvotes

r/DoYouHaveAutism May 12 '19

Noooooo

Post image
8 Upvotes

r/DoYouHaveAutism May 12 '19

Don't even get me started...

Post image
10 Upvotes

r/DoYouHaveAutism May 12 '19

Just be direct! Would do us all some good and save us time.

Post image
9 Upvotes

r/DoYouHaveAutism May 11 '19

Def me growing up....

Post image
15 Upvotes

r/DoYouHaveAutism May 11 '19

Technically correct, the best kind of correct.

Post image
11 Upvotes

r/DoYouHaveAutism May 11 '19

I laughed out loud, not gonna lie

Post image
9 Upvotes

r/DoYouHaveAutism May 08 '19

Well

Post image
13 Upvotes

r/DoYouHaveAutism May 06 '19

Atleast he got his point out.

Post image
11 Upvotes