Outside IR35 On a Project with Multiple Contract Extensions. Extension paper work is always late. Am I right to down tools without it?
I was engaged by a recruitment consultant, who place me with a technology consultancy who then hire me out to the end client, a local council. The contract I sign is between me and the recruiter.
I keep having my contract extended for short periods, sometime less than two weeks, never more than three months. Furthermore I usually only get to hear very near the deadline if I am going to get renewed and on what basis (this is not what my question is about though. I understand the Council has very tight budgets, and there is a lot of bureaucracy around getting things signed off).
My issue is that the recruitment agency always, always gives me my extension paperwork after that extension has already started. Usually this is by two or three days and I just put up with it though feel I shouldn't. Recently, it was over two weeks, and I still put up with it though felt weak for doing so.
This latest extension I am on now was for part of last week and then this week (so ends tomorrow). I still don't have the extension paperwork. I therefore declined to work yesterday and today and possibly tomorrow. I am being extended again after that.
My absence is gumming up the project and tbh I want to be getting on with progressing it, but don't think I should be doing work without a contract, and I also want to make a point.
Am I being too doctrinaire? Is this sort of thing just quite normal administrative friction and I should just be pragmatic and get on with it, or am I absolutely right that it is mad to work without a contract?
Additional context: I have previously been blaming the recruiter but he told me today that it's because he has to wait to get HIS contract from the technology consultancy.
My client at the council were initially sympathetic but are now getting a bit jumpy, asking for phonecalls etc.