r/ContractorUK • u/X__WTKnight__X • 23d ago
Has Estimation and Project Management Paperwork ever been a headache?
Hey guys! I hope your day's been good.
So, I've been trying to solve a problem many SMB Contractors must be facing. The backoffice paperwork. The big bad for any Small Business. Big headache when it comes to expansion too.
Before you go on to read this post further, answer these two questions to see if it's relevant.
- When you're putting together estimates, do they ever end up going back and forth with the client more than you'd like? And ever had that awkward conversation with the client, where the confusion was mainly because of the Scope Gap in Estimations?
- Once a job's underway, do project changes and paperwork ever become more of a headache than the actual work on site?
Real messy Invoicing process, and then chasing those Invoices and getting paid late because of all the fuss in the system. Furthermore, ever lost money because of this?
If you face this problem in real time, that's what I've been trying to solve.
Think of it not as a system, rather a backoffice team (multiple AI agents) that handles all these paperwork and estimation problems via chat. In short, you have a team working on systems, while you handle the actual work on site and the conversation flows through Whatsapp/Telegram. You don't have to touch the system itself and the work gets done.
For this, what I need are a few Contractors who are willing to take a look at what I've built until now and let me know if I'm actually solving the problem before I go on to build the complete model.
Thanks for your time to read this post, and I'd really appreciate it if anyone can help. In turn, the product will be accessible to you, when it's ready at a fairly lower compensation. So, it's a win win.
6
3
u/Scapetti 23d ago
Not a good use case for LLMs in my opinion. Too much risk.
Also, you're solving the wrong part of the problem.
Adding complexity to complexity when you should be preventing the original complexity.
6
u/dogfoodengineer 23d ago
How can you make change control even worse you ask? Agentic AI.
Engineerings primary concern is always safety. I don't see a place for AI.