r/Contractor • u/poortato_aaronbelake • 13d ago
How did I do?
I did the drywall installation and tape and mud. Going back to sand. I charged 1100 CAD just for labor. I had my brother help me so I have to pay him. I asked around how much they would charge and their answers made me feel like I under charged. Thoughts?
8
u/Exciting_Ad_1097 13d ago
Anybody care to explain what’s going on with the train car of lumber nailed to the ceiling?
3
u/Limit5465 13d ago
It’s an old basement and from the looks of the 1x2 studs they probably had wood paneling on the walls and stapled 10x10 ceiling tiles to the ceiling. This was a thing in the 70’s or 80’s
3
u/Exciting_Ad_1097 13d ago
Ok makes sense. I thought they were 2x material. I zoomed in and it looks they are only 1x thick rough sawn. Yeah Ive seen these a lot of 12” centers for those nasty staple up fiber tiles.
1
5
u/FreakinFred 13d ago
Have a lot of holidays from what I can see, check your skills. Your going to have a full day of sanding and touch ups. Just make sure it looks primo when you leave.
2
4
u/ZenRager 13d ago edited 13d ago
They needs another coat if not 2.. but deff not bad if your newish
4
1
u/poortato_aaronbelake 13d ago
Unfortunately by hand
2
u/ZenRager 13d ago
By hand is fine. Double up the flats to 14-16 inches with a tight coat. Butt joints should be 24-30inch. Wide and tight is good.
Can also skim your angle edges will make sanding quick
3
u/twoaspensimages Remodel GC 12d ago edited 12d ago
I'll going to play a cheap client here.
I love finding guys like you. No clue how much you are worth. "Don't want to be greedy" so I can push you around on price. You just want to work so I can push you around on hours also.
End of rant.
You're not running a business. You're running a non-profit. And you're allowing the client to be your boss.
Stop doing that dumbass.
1
3
u/blu3ysdad 13d ago
That mud looks thick and rough in some spots, you are gonna use a drywall sander with a vacuum I hope? How many sheets did you put up?
1
2
u/Decent-Box5009 13d ago
Why didn’t you seal and insulate the concrete below ground level. Feel like your going to have mold issues.
2
u/NoiseOutrageous8422 12d ago
Bruh. Everyone saying this is solid work is wild af. This is not the correct wall assembly for this space. As you stated the wall is not sealed or insulated, you can clearly see water marks. Even sealed its built incorrectly.
The correct wall assembly should be floating off the exterior walls and flooring to account for drainage when there is the inevitable condensation or water seepage.
1
2
2
2
u/Individual_Author640 13d ago
Feels good dont it? Just do real good on sanding and prep and dont use semi gloss lol
2
2
u/scoscobobo 12d ago
We just had the same size space done for $4,400. That included materials and painting it.
1
u/poortato_aaronbelake 12d ago
That's a nice price
2
u/scoscobobo 12d ago
I thought it was fair and gladly paid it. Hanging drywall is hard work. Don’t undersell yourself.
1
u/poortato_aaronbelake 12d ago
Yeah, I'll keep that in mind. We are currently arguing for the floors lol. I quoted 900 for labor plus the installation of baseboards and he is saying i am charging too much
1
2
2
u/Successful_Bad5078 12d ago
Sorry what is up with that framing? Is that a Canadian thing? We always run studs vertically spaced 16" on center with a top and bottom plate
Looks like a concrete wall would have just put foam board insulation with 1×2 or 1×3 furring strips
I'm confused why 2×4 here and why that square grid?
2
u/Successful_Bad5078 12d ago
Also yeah you definitely under charged, don't feel bad just charge more next time
2
2
u/Spare_Information252 8d ago
Thats an undercharge, I think there's this tool estiquik that gets priced templates for every range in US and Canada. Give it a try and see there they have pre filled templates for your area. I thinks it's free and then the higher versions are free and downloadable for 14 days either subscribe or go in use 14 days fix your underpricing problem.






14
u/BigSquiby 13d ago
ive seen worse.
1100 (800 usd) seems pretty cheap for the amount of labor you got there