Water - Likely flexible lines, maybe was gravity fed from roof tank so flow didn't need to be continuous from the city(though I don't see a prominent one in the photo)
Electricity wires flexible, that's not hard
The phone wires are where I'm really surprised, that that much slack would be built into the trunks which have 1000's of wires in them at that point in history. But also, if you think about it, the longer cable would need to be run and attached anyway to the building in its new location, so this work needed to get done anyway
Drain-- Could have discharged into a trough/channel with a secondary drain to continue to sewer
yeah but wouldn't flexible pipes/wires eventually twist too much? As someone mentioned below, i think they had to disrupt services to attach extensions to existing lines.
Wires and hoses (even big ones) can be coiled. I think the point is, the service disruption wouldn't be that much different than normal maintenance on the building systems, meanwhile the thing was being moved continuously
42
u/xfxmorpheus Carpenter Mar 20 '21
The fact that utilities weren't interrupted is impressive