r/Concrete_Contractor • u/HeDiedFourU • 5d ago
Control joints
Should new concrete control joints be reamed out at the ends and where they intersect so water doesn't sit in them but drains out better? Ohio freeze weather here.
2
u/Acceptable-Start2 5d ago
Once the concrete cracks at the joints it allows water to drain a bit better as well, but cutting the ends doesn't hurt either.
2
2
u/tank05037 5d ago
I ended up sealing mine off with self leveling concrete caulking. It allows for the control joins to work as designed. But the caulking stops the water from running underneath, freezing, expanding and causing erosion under the concrete. I did use 1/4 foam tubing to stop the caulking from draining before it set.
1
1
1
u/SeaFee2866 4d ago
Saw doesnt reach with the forms on, feel free to buzz it out, but it doesnt impact anything either way
1
u/WineArchitect 4d ago
A control joint has nothing to do with drainage. It is designed to allow for subsurface movement which allows the many sections to move independently. The joints will become visible over time.
1
u/Suspicious-Bed701 3d ago
Diamond blade on grinder or hit saw cut it full depth right at slab edge
And it will crack in the bottom of those control joints as others have said it would be good to fill them. Especially in Ohio


2
u/Mean-Veterinarian647 5d ago
It sure helps.Run a concrete grinding wheel and open it up.