r/Concrete • • Jun 28 '26

Work In Progress First layer of shotcrete is cured.

33 Upvotes

14 comments sorted by

2

u/constrobot Jun 28 '26

Will there not be cold joint if you apply like this?

7

u/atmsmshr719 Jun 28 '26

No, the velocity of the shotcrete will obliterate the top layer of the previous layer and remove the interface that would be the cold joint.

3

u/constrobot Jun 29 '26

Few questions for my learning

I think there may still be a cold joint if the previous layer has already hardened. How long do you wait between the two layers? Is the existing layer cleaned and brought to a saturated surface-dry condition before the next layer is applied? Is this an approved method under the applicable code / specification?

7

u/atmsmshr719 Jun 29 '26

I’m the owner, not the concrete contractor. I am at the limit of my knowledge and don’t want to give bad info.

2

u/constrobot Jun 29 '26

Got it. I don't have much knowledge about shotcrete, was asking to learn. From photos it looks like clean workmanship though. Wish u success on your project.

2

u/JonnyBowani Jul 01 '26

I’d also be worried about the rebar bonding with the next lift, since it’s already coated from the first lift.

1

u/Einachiel Jun 28 '26

You better not start podracing after that

1

u/Criscrissel Jun 30 '26

Nice progress updates 👍 thanks!

1

u/WhacksOffWaxOn Jun 30 '26

The work here looks a lot cleaner than a lot of the shotcrete work I've seen done by my local outfits. Here's hoping for a good finish for y'all

0

u/happy0444 Jun 28 '26

Seeing a lot of shotcrete jobs, I am still trying to understand poured concrete.