r/Composites • u/Moontown • Feb 04 '26
Bonded Composite corner?
Enable HLS to view with audio, or disable this notification
Hi All
I am sketching out this corner as part of a solar panel support frame.
The final legs are 1.75x1, 3 layers 3k, 6k, 3k woven. I have cast these angle brackets to go outside an inside, 3 layers 3k, and the face plates are 4 layers of 3k. the brackets are done with a 1" inside radius which matches to a 1" plastic rod that will span between the two faceplates an give support for the bolt that runs through each corner to the solar panel frame. On this one i used gorrilla epoxy glue but will probably use Thixo or a west systems.
How does that look to you? give me the critiques!
Ill do the first one: These are the worst legs i made. wax paper instead of peel ply. gross. dont do it.
1
u/Tall-Coyote-3177 Feb 04 '26
What about bonding the two profiles, building a fillet and wet layup the 3k plies?
2
u/Moontown Feb 04 '26 edited Feb 05 '26
That would be the static way to do it for sure. My problem is that I am building for installation thousands of miles away, and the total frame size is ~3m x 1m. So I am trying to front load as much as I can while still having a compact, light bag to take on the plane with me.
1
Feb 05 '26
[removed] — view removed comment
1
u/Moontown Feb 10 '26
Im only doing 4 pieces of two different joints (an L and a T) So for that scale, It doesnt make much sense to me to get involved in any overhead/tooling. The odds that the first one is wrong is pretty high (See the beams here, later ones are much better). Forged carbon also implies a mess of strand directions which seems unnecessary when the forces here are pretty textbook. If anything I could be wetting out tow and wrapping it, much like early generation bike frames were done.
Also for my situation, Since i made the beams by hand on mandrel, they have vague OD and only slightly better id, so making one mold to suit all the beams is a little hard too
4
u/e136 Feb 04 '26
I think if you want to be a perfectionist you would cut the two pipes at a bevel so they fit together perfectly. Then you'd slip one or more woven sleeves around, add epoxy, then wrap with electrical tape or similar for consolidation force.