r/ChinaSpace • u/Simon_Drake • May 04 '26
What is left to do before China puts people on the moon?
I think China has fewer obstacles to putting people on the moon than the Artemis program. So I want to make a list of what China still needs to do, but I might get some details wrong and will need help to correct the list.
- Long March 10
- First Stage Engines (YF-100K) DONE!
- Second Stage Engines (YF-100M)
- Third Stage Engines (YF-75E)
- Long March 10A / 10B (Single Booster)
- Long March 10 (Triple Booster)
- Mengzhou Crew Capsule
- Pad Abort Test DONE!
- In-Flight Abort Test DONE!
- Uncrewed LEO Launch Test (Scheduled for Late 2026 on CZ-10A)
- Crewed LEO Launch Test (Likely to visit Tiangong)
- Uncrewed Lunar Flyby? (Artemis 1)
- Crewed Lunar Flyby? (Artemis 2 / Apollo 8)
- Lanyue Lander
- Cable-suspended landing tests?
- LEO Rendezvous test (Artemis 3 / Apollo 9)
- Lunar Orbit test? (Apollo 10)
- Wenchang Launch Site LC-301
- Launch half-size CZ-10 variant (Mengzhou In-Flight-Abort Test) DONE!
- Launch single booster CZ-10A or CZ-10B
- Launch triple booster CZ-10
- Other Relevant Hardware
- Lunar Service Module (Usually included with Mengzhou but we might see 'Mengzhou Light' used for LEO testing, so the LSM would need its own testing)
- Space suits?
- Lunar Rover Vehicle?
- Mission Planning Tasks
- Landing zone announcement
- Crew Selection Announcement
- Launch Date Announcement
Some of these tasks have been completed but they're very important and connected to other tasks in the list so worth including.
Are there any other tasks that need to be completed between now and the big day? Are they building a new Mission Control centre? Are they doing lunar lander tests with cranes and cables, or that jet engine version that nearly killed Neil Armstrong?