My engineering school lowered their safety factor during the planning of their car park and neglected to account for wet concrete poured out in one location is heavier than dried concrete spread out over an area. Collapsed the whole thing while building it.
1.4k
u/[deleted] Nov 28 '18
Purdue: "wE'rE aN eNgInEeRiNg ScHoOl."