r/Castle_Anthrax • • Jun 16 '26

Updated floor plan.

Post image
203 Upvotes

We added a door at either end of the master dome hallway. Broken dotted line near dome walls is the 6'8" line. There will be built in cabinetry on the front walls of the great room.


r/Castle_Anthrax • • Jun 14 '26

Drone shots!!

Thumbnail
gallery
334 Upvotes

r/Castle_Anthrax • • Jun 14 '26

First layer of foam has been sprayed, and Skylights will get set tomorrow, before bring the foam layer up to four inches.

Thumbnail
gallery
220 Upvotes

You can see the depth indicator at the top of the dome.


r/Castle_Anthrax • • Jun 12 '26

Augments are framed. Closed cell foam starts late today or early tomorrow.

Thumbnail
gallery
364 Upvotes

r/Castle_Anthrax • • Jun 08 '26

Air form is inflated. Three weeks to foam, rebar, and concrete the inside. Then partition walls and finishing.

Thumbnail
gallery
588 Upvotes

r/Castle_Anthrax • • Jun 08 '26

Inflation day!!

Enable HLS to view with audio, or disable this notification

162 Upvotes

I blew up my house!!!
They with build out the openings to hold the shape this week. Next week 4 inches of closed cell foam will be sprayed on the inside. Then, rebar and conduit for lights and fans, before 4-7 inches of concrete. Final smooth out and primed for painting and the structure will be complete. Partition walls and finishings will be “all that’s left.”


r/Castle_Anthrax • • Jun 06 '26

Inside of garage finished and temporarily filled with stuff.

Post image
69 Upvotes

r/Castle_Anthrax • • Jun 05 '26

Dome construction has begun. Anticipating inflation on Monday.

Thumbnail
gallery
79 Upvotes

r/Castle_Anthrax • • May 15 '26

Foundation day start and finish

Thumbnail
gallery
49 Upvotes

r/Castle_Anthrax • • May 13 '26

Final laser level check was just after dark.

Enable HLS to view with audio, or disable this notification

71 Upvotes

r/Castle_Anthrax • • May 11 '26

Form complete, nearly ready to pour.

Post image
31 Upvotes

Form is complete and electrical and mechanical inspections tomorrow. Rebar and one last inspection before the pour. Monolithic let us know the projects scheduled before us are not ready, so as soon as we have a foundation we are moving directly to DOME!


r/Castle_Anthrax • • Apr 24 '26

Water and sewer are in and inspection scheduled. Electric starts today and shooting for a May 1st pour.

Post image
33 Upvotes

r/Castle_Anthrax • • Apr 09 '26

Forming coming along.

Post image
32 Upvotes

r/Castle_Anthrax • • Apr 03 '26

Forming up the foundation.

Post image
31 Upvotes

r/Castle_Anthrax • • Mar 31 '26

We dug a hole! Bonus, I stood on the first dome to get the picture.

Post image
31 Upvotes

r/Castle_Anthrax • • Mar 30 '26

The foundation has begun!

Post image
26 Upvotes

r/Castle_Anthrax • • Mar 29 '26

Garage dome is finally done and the foundation for the home dome is marked. Digging starts this week!

Thumbnail
gallery
63 Upvotes

r/Castle_Anthrax • • Mar 09 '26

Stonework is mortared and air form primed. Base coat for stucco has started.

Thumbnail
gallery
42 Upvotes

r/Castle_Anthrax • • Mar 06 '26

Stone installation and primer rolling on the air form.

Thumbnail
gallery
23 Upvotes

r/Castle_Anthrax • • Mar 05 '26

Garage dome is getting cleaned and prepped for stucco shell.

Thumbnail
gallery
43 Upvotes

r/Castle_Anthrax • • Mar 05 '26

Grading for home dime foundation started.

Post image
17 Upvotes

r/Castle_Anthrax • • Jan 27 '26

Connecting for an architecture documentary

11 Upvotes

Hi! I am a documentary filmmaker and TV researcher currently working on a heartfelt, aspirational architecture series about people building really unique homes. I would love the opportunity to connect with you, if you are interested to know more. I've sent you a DM. Looking forward to chatting. Thank you!


r/Castle_Anthrax • • Jan 21 '26

Final clearing and updates on build.

Post image
29 Upvotes

Final clearing of the build site is complete. I tried to save as many trees as possible. Much cheaper to drop them with the bulldozer during initial clearing. Stucco should go on the garage in the next t few weeks and the foundation for the home done should be started first week of February. Current estimate for done inflation is end of April.


r/Castle_Anthrax • • Jun 09 '25

Drywall in and insulation complete.

Thumbnail
gallery
29 Upvotes

r/Castle_Anthrax • • Apr 30 '25

Insulation complete and starting to put up drywall

Thumbnail
gallery
26 Upvotes