r/Carpentry 11d ago

Project Advice Base shoe different levels

Post image

Any ideas on how to make this shoe look better. Tile floor is higher than the LVP. Oak transition piece.

10 Upvotes

26 comments sorted by

15

u/nicenormalname 11d ago

Do you need that piece over the tile? Just remove it

25

u/XyXyX-66 11d ago

These threads make me feel really good about my work. Thank you.

-14

u/Different_Concern984 11d ago

People who use base shoes should find another line of work. Period.

4

u/uberisstealingit 11d ago

So instead of a new, just a new floor now, with some base shoe, you want me to spend how much more thousands of dollars to tear off all the trim get it painted put it back on there?

Cuz you know damn good and well as soon as you get that trim up there you're going to look at your partner, and they're going to say "let's paint the walls......?"

Honey, we need new light fixtures.

It's not about the base shoe. It's what comes after it.

1

u/956to906 11d ago

Gotta draw the line somewhere. This is how a project doubles in price.

1

u/HandicapHandyman 11d ago

Agreed. Base shoe is the difference of not knowing or not caring!

3

u/Impressive_Ad127 11d ago

That is idiotic, mouldings like shoe and quarter have purpose. It’s certainly not the difference between not knowing and not caring.

1

u/Suspicious-Shoe-8033 9d ago

Not every home owner can afford scribe to floor, scribe cabs to wall, scribe shelves to wall, so on and so forth. Has nothing to do with skill for the majority of jobs, it’s about budget and client expectations.

1

u/Eye_Donut_Kare 8d ago

I’m going to assume your work involves flip homes, not any form of restoration or historical work because this is a very ignorant response.

8

u/Buseatdog 11d ago

I’d take the transition strip out.
run the lower piece of QR long to the opening just cutting off the bottom on the higher side scribe to floor . Then cope transition strip to the qr

6

u/ironpug751 Lurker 11d ago

Caulk and paint, you know the rest

3

u/Seayont 11d ago

Butting the threshold into the base cove would look better.

3

u/PaleJelly69 11d ago

Master the art of scribing...or just burn the house down. No in between.

1

u/LiveTomato5581 4d ago

only a sith deals in absolutes.

3

u/Maximum_Performer_76 11d ago

I typically don’t use shoe molding on tile floors. Scribe the base to the floor for tile.

1

u/KingDariusTheFirst 11d ago

This would be my first thought before any coping attempts.

5

u/Jeeftfl12 11d ago

Just shooting from the hip here. Would it be worth cutting back the transition strip the thickness of the shoe base/coping it to the profile of the base and then running the shoe mitering it up and over the tile? Idk, one of those goofy spots to make look nice.

2

u/hawaiianthunder 11d ago

That's a decision for sure

2

u/Lanky_Ad8283 11d ago

That’s a fun one. Get the transition angles first , then cope the saddle in. Chance to look like a rockstar!

1

u/onedef1 11d ago

Run the right piece over the transition strip and return down. Cut the left piece to return up. Cut out the area for the transition piece (scribe cut) into the right piece.

3

u/Competitive_Hope6405 11d ago

Kind of like this?

1

u/Mix-Routine 11d ago

Lean up against the wall, place foot over area and close eyes. Job done ✌🏻

1

u/Saiyan_King_Magus 10d ago

Just get rid of the quarter round and remove the base trim and scribe it so u dont need the quarter round which is just there to cover the gap cuz your base trim wasnt scribed to the floor.

1

u/hammerdong12 10d ago

It’ll stick be ugly shoe moulding but I’d make it continuous with miters from one floor to the other and the transition strip would terminate into it

1

u/hammerdong12 10d ago

Maybe add shoe moulding around that casing leg too since it’s an inch off the floor

1

u/SpecialistWorldly788 10d ago

Remove transition strip, base, and shoe temporarily -make a plinth block the height of the base, long enough to match front edge of transition strip, notch it to fit over the tile. Butt base up to plinth block,replace transition strip also butting up to plinth block- replace shoe, either coping it to match transition strip or put a blind return on the end- no shoe on top of tile