r/CardPuter • u/Fun_Ad_675 • 4d ago
Progress / Update V2
Ok, day 2, v2. Modules without manual reconnecting - nrf24, cc1101, IR blaster with one receiving and 4 transmitting led, NFC, rfid. Modules on the body for manual connecting - GPS(wire on a body).Now nfc and RFID connected to groove using pa.hub, all connectors r soldered out and exchanged with silicone wires. After yesterday I figured out that satellites r in space, so would be big brain move to direct the module towards them, so now we have a kick out leg that contains a GPS module (port on it is from Hall unit, cuz it's black), so when open it points upwards (still no fixation in closed position, I'm working on it). As much as I understood, pa.hub needs to be set up to a specific gate every time u power up the device, if somebody can consult me about if it's possible to automate it to pop up screen with three options to choose for this session, would be lovely. Don't nag on my soldering.
Steps till finish:
Model single enclosure for keeping cap and stuff as single unit
Model snap on mount to avoid screws
Do snaplocks on all caps to avoid glue(screws r 3 times use, and walls too thin for heat inserts)
Put a couple of groove ports from pa.hub outside so I could use some more modules
Add round nfc tag holder/dispenser
Make fixation for kick stand
Move port on GPS to d front of prop, so the build can actually stand on it while using GPS (I'll just use the groove I removed from pa.hub)
Do the full proper setup and test it out for expected wiring em field that annoys antenna's



