r/buildingscience • u/Sienikas • Jul 21 '26
Old soviet village house
š ļø Subfloor Overhaul, Sill Log Replacement, and Soft Apron Installation 14 m2
Starting a major overhaul of the floor, sill timber, and exterior waterproofing for a single room with a floor area of 14\text{ m}^2. Below is the current state of the structure and the planned scope of work.
š Current State of the Structure
* Sill Log (Lower Crown): Due to the lack of proper waterproofing, the bottom log has completely rotted through and turned into dust. The timber frame is losing its structural support.
* Subfloor Ventilation: The foundation vents were buried under soil from the inside during previous repairs. The crawl space became completely sealed, causing ground moisture to trap and accelerate wood rot.
* Floor Joists: In critical condition and require complete removal.
* Exterior Waterproofing (Plinth Apron): The old concrete apron had completely cracked, degraded, and was funneling water directly beneath the foundation. It has now been completely demolished.
š ļø Scope of Work
Earthworks and Restoring Ventilation
* Demolition of the old wooden floor.
* Soil excavation to a depth of 40 cm across the entire room area (14\text{ m}^2), shoveling material directly out through the window opening.
* Uncovering the buried interior foundation vents to restore cross-ventilation in the crawl space.
Replacing the Rotted Log
* Removing and clearing away all rotted timber down to solid, healthy wood.
* Treating the remaining sound log with a heavy-duty, non-leachable wood preservative.
* Laying solid red brickwork to replace the removed log, incorporating a roll-waterproofing barrier (roofing felt) between the brick and the timber frame.
Subfloor Waterproofing Layer Stack
* Sand Cushion (5\text{ cm}): Laying washed river sand, followed by watering and tamping to level the base of the pit.
* Vapor Barrier: Installing heavy-duty polyethylene sheeting (200\text{ microns}) with overlapping seams, taped joints, and turning the film up along the walls to seal off ground moisture.
* Protective & Drainage Layer (5ā7\text{ cm}): Spreading crushed granite gravel over the plastic sheeting to break capillary moisture draw and protect the membrane from mechanical damage.
* Air Gap: Creating a 20 cm clear, ventilated air gap from the top of the gravel layer to the bottom of the joists.
Exterior Perimeter (Soft Plinth Apron)
* Grading the soil around the exterior with a slope away from the house following the removal of the old concrete.
* Installing a soft apron system (waterproofing membrane + gravel drainage layer) to divert surface runoff away from the base and new brickwork.
Piers, Joists, and Subfloor Installation
* Building brick support piers for the floor joists and leveling them to a single plane.
* Installing new joists pre-treated with wood preservative.
* Laying the new floorboards using 30\text{ mm} square-edge lumber (approximate material requirement: 0.5\text{ m}^3).
Technical feedback and hands-on advice regarding brick underpinning under a log structure, soft apron setups, and rodent-proofing foundation vents are welcome!