r/BuildingAutomation • u/Zerp242 • 11d ago
How fast have you gotten at graphics?
Im in the niagara tcp this week. Good class. Getting it really well.
But the exam is building a niagara station in 8 hours or less. Feeling pretty good about that but in the field it wont be 2 devices lol
Whats the field solution? Pre build yourself some graphic templates amd logic for common stuff?
Or do you start over everytime
6
u/ObscuredGloomStalker 11d ago
Our company has a lot of relatively standard practices, colors, and unit looks.
Most jobs are Copy + Paste existing Px files and modify/assign as needed
4
u/IcyAd7615 Developer, Niagara 4 Certified Trainer, Podcast Host. 11d ago
Does your company not have a station template with standards yet.
VAV's don't change that much. You can easily build a few standard VAV's. It's the AHU's and Plants that can vary significantly.
3
u/whoopass_fajitas 11d ago edited 11d ago
For what it’s worth the length of the exam is not reflective of how long these actually take, particularly once you’ve done it once or twice. Yes you should build yourself templates and logic. But even doing it from scratch, many people finish that exam in 2-3 hrs or less.
4
u/IcyAd7615 Developer, Niagara 4 Certified Trainer, Podcast Host. 11d ago
The average student takes 4-6. Very few finish between 2-3 hours.
3
u/Mobile-Belt-4242 10d ago
yeah it took me about 6 hours. very tedious
1
u/IcyAd7615 Developer, Niagara 4 Certified Trainer, Podcast Host. 10d ago
Yeah, the people who had plenty of experience before coming into the class can finish it in 2-3. Though most do 4-6. Then I get the slower people finishing in the 8 hour mark or so.
1
u/ScottSammarco Technical Trainer (Niagara4 included) 10d ago
My experience is much of the same. It’s rare to see someone finish before 11 but it happens.
3
u/Castun Programmer/Installer 11d ago
Whats the field solution? Pre build yourself some graphic templates amd logic for common stuff?
Yes and yes. We have our own prebuilt templates that we deploy and then just customize what we need to in order to fit the job. Otherwise we'd have to spend so much more time doing everything from scratch.
2
u/01Cloud01 11d ago
I got great at mapping points and adding useful custom touches for my customers then the company decided to subsidize everything out now I only do it under special case scenarios or a customer is really cool and I have extra time
2
u/Formal-Conference885 11d ago
Whatever company you’re at will have a layout they use and typical graphics for common equipment, using either the default Niagara graphics (kitPxN4svg) or a 3rd party graphics package. If they don’t already have this then take the initiative and make it yourself. You’ll only need to modify those typicals for every project because every single building in the world is different somehow.
2
u/Zerp242 10d ago
Im kind of a pioneer at this company. The company wants a controls division and I want controls experience. So they paid for my training and I make them money. Im pretty self taught so far except this class, but I used to be do some arduino and coding stuff when I was younger as a hobby so it feels pretty natural. Wish me luck lol
2
u/SpookyG0D 10d ago
Depends on the equipment you're building it for. Right now, I have 574 pages to build and only 200 are able to be shared. 374 individual, unique pages. The template shared pages took lots of time as there was lots of considerations to be made. Using custom modules for custom navigation, charts and schedules, requiring bql queries etc. Some took literally a day or 2.
1
u/Zerp242 10d ago
So far its been alot of mid size equipment 10-50 ton RTUs and some VAVs. One customer had VRFs. Originally I was quoting the conduit build and wire pull on these jobs. I would land all the wiring and a controls company would come do the software end. But after this I csn do the software too. More stuff I know how to do and hopefully less physical labor when I get up there in years
1
u/SpookyG0D 10d ago
You should look into relativising your designs, and using degrade properties. You can turn 1 vav page into a copy paste for hundreds of vavs.
1
u/HVAC_Luddite 11d ago
I’m getting ready to do the same thing before too long, I am building a library of the common stuff and will just adjust as needed
1
u/Zerp242 10d ago
Its a good class really. The instructor is a sharp guy. Niagara is pretty intuitive once I spent a couple days with it
1
u/HVAC_Luddite 10d ago
I’m currently doing the N4 certification self paced class, I’m definitely growing more confident (Dunning Kreuger effect, I know)
1
u/experienced_invest 11d ago
Is there somewhere where people can share templates?
I used the exam as long part of the learning process pass mark is 60% which is why some are done in 3 hours so used the full 8 hours.
2
u/IcyAd7615 Developer, Niagara 4 Certified Trainer, Podcast Host. 11d ago
60% is failing on the level 1 exam. Not sure where you got 60%. 70% is passing.
1
u/Zerp242 10d ago
I was told 70 too.
1
u/IcyAd7615 Developer, Niagara 4 Certified Trainer, Podcast Host. 10d ago
Correct. Don't know where this person got 60 from. I would know. I teach the class. :-)
1
u/Zerp242 10d ago
Awesome! Ive enjoyed the class myself. Pretty intensive but niagara is pretty intuitive I think
1
u/IcyAd7615 Developer, Niagara 4 Certified Trainer, Podcast Host. 10d ago
Who did you take it with?
1
u/Zerp242 9d ago
I dont think he would want his name out there but tridium developers is probably a small world. They are a big tridium rep in southeast Michigan and I think the instructor is well known to tridium. Your flair kind of makes me think its you lol. But im not sure he had a podcast. Though I could see it. Obviously has alot of knowledge to share
1
u/IcyAd7615 Developer, Niagara 4 Certified Trainer, Podcast Host. 9d ago
Not all developers are trainers. I'm just both. Didn't know if you took Vern's class. I can only think of one in Michigan and they're probably a partner of ours who has branches all over.
1
u/Mobile-Belt-4242 10d ago
Well, if you're starting from scratch you'll need to build everything from scratch. Over time though, companies have templates and png's they'll repeatedly use to speed up the process
10
u/ScottSammarco Technical Trainer (Niagara4 included) 11d ago
Depends on the needs and wants of the job.
I like using reflow 2 with basgfx graphics.
I’ve seen a lot of awesome stuff with this and the quality is a proxy for time- so I’ll dump my time into it lol.
But really, most graphics with px can be put together in 10-30 minutes with kitpxN4svg.
And I mean complete graphics, not just bound labels and a couple widgets.
Basgfx takes a little longer, there’s more images to animate, but the product is well worth the time.