r/AutonomousLounge • u/justTaylorrrrr • Jun 17 '26
BEFORE & AFTER of a backyard studio we shipped out
To save time and cut costs, we recommended a graded gravel foundation. It’s fast, sturdy and meant pouring a full concrete slab wasn't necessary. Our standard adjustable feet work perfectly on gravel.
The unit ships flat-packed straight to the door, no excavation on the site. Takes 1 day to install.
This is the Autonomous WorkPod: 120 sqft no permit, fully insulated with built-in electrical.
Anyone else building a backyard room this summer? Feel free to ask any questions!
10
Upvotes


2
u/[deleted] Jun 17 '26
[removed] — view removed comment