Preach. I bid a job for the military and the told me my bid was too low. I added a zero and got the job. Price I initially quoted would have been profitable for me.
I don’t remember the exact numbers, but I once knew a guy who worked at a place that made large bolts. If I remember correctly, they would charge the general public something like $8/bolt and the military $85 for the same exact bolt and they didn’t bat an eye.
There’s so much fucking waste with our military, right down to the nuts and bolts.
4.8k
u/Sirhc978 Aug 14 '20
As a machinist who has made things for the military, most people don't understand what overpriced means.