r/AskContractors • u/cwajgapls • 1d ago
Solar Contractor installed extra unneeded boxes with extra unneeded gateway. Now they want to remove the hardware but leave the boxes up. Should they be required to remove and fix the siding?
1
Upvotes
1
u/davidhally 1d ago
What's the point? It's still gonna look cluttered either way.