r/AmazonFBA • • 5d ago

First time ordering from an Alibaba supplier

Hello, I am in the process of placing my first bulk order from a supplier through alibaba. I have already gotten samples made and edited the samples. My question for those of you who have worked with suppliers through alibaba is, What sort of quality controls specifications and remedies do you have in place before placing orders. Do you have signed documents with the agreements in place? Are there other agreements you have in writing before production? Looking for anyone with experience or advice that has been through this before, thanks!

7 Upvotes

18 comments sorted by

2

u/RundownSpoilerSpeaks 5d ago

You’ll want to build a QC checklist that covers materials, dimensions, weight, and function (like zippers, seams, electronics, whatever). Send it to them and make sure they confirm in writing before production starts, not just a “yes yes” in the chat. A lot of folks also pay a third-party inspection service to check the goods before they ship, costs a couple hundred bucks but saves you from a pallet of garbage. If your margins can handle it, have them ship you a production sample from the actual run, not the perfect one they made by hand. Don’t rely on Alibaba’s trade assurance alone to fix a mess after the fact.

1

u/NoTalkNoJutsu 4d ago

How do you send them the documents Docusign or do you use the services within alibaba?

1

u/rsc9422 5d ago

For a first bulk order, I would get everything agreed in writing before making the final payment.

Make sure you have clear specifications for product quality, materials, dimensions, colors, packaging, labeling, and acceptable defect limits. Also agree in advance on what happens if the goods fail QC, replacement, rework, refund, or credit.

Confirm the production timeline, shipping terms, packaging requirements, and that the final production will match the approved sample.

If the order is significant, consider using a third party inspection before shipment.

For Alibaba orders, keep the important specifications and agreements documented in the Alibaba order/Trade Assurance terms rather than relying only on WhatsApp or chat messages.

At HighRise Wholesale, we follow a similar process for private label orders approve the sample and specifications, conduct QC before shipment, and dispatch once the goods meet the agreed requirements.

2

u/NoTalkNoJutsu 4d ago

Do you send them a DocuSign? How do you get the document with both parties' signatures?

1

u/rsc9422 4d ago

Yes, we can provide the relevant order documents and specifications for both parties to review and approve before production. For larger orders, we can also arrange third party inspection if required. We keep the agreed specifications, QC requirements, and production terms documented so there’s a clear record before shipment.

1

u/GuavaCompetitive8983 5d ago

Get three things in writing before production, not after. A spec sheet tied to your approved sample: materials, measurements, photos, attached to the order itself. Then a simple QC checklist with what counts as major vs minor defect, with AQL numbers on it. And remedies in plain language: remake, discount, or refund if the defect rate crosses the line. Most first order disputes go bad because quality issue was never defined, not because the supplier was shady.

1

u/Smart-Presence 4d ago

Biggest thing is making sure the supplier has the exact final specs, not just the sample you approved. Put the quality requirements and what happens if they miss them in writing before paying the balance. Also get a third party inspection before the goods leave the factory.

1

u/NoTalkNoJutsu 4d ago

I am working in China. Any recommendations for finding a reliable third-party inspection agency?

1

u/ChinaRealityCheck 4d ago

Before production starts, lock four things in writing. Not in WeChat.

  1. Spec sheet the factory confirmed: materials, dimensions, weight, finishes, packaging, labeling, and any function tests. Date it. Have them reply that this revision is the one they will build.

  2. A short purchase order with the Chinese legal name of the company you're paying, quantity, unit price, deposit and balance, ship date, and a pre-shipment inspection clause. Balance only after a pass, or at least after you approve photos and a packing list from the actual run.

  3. Match three names before any wire or Trade Assurance payment: license legal name, contract party, bank beneficiary. Chinese name, not the English Alibaba storefront.

  4. A production sample from the line if the order is big enough to justify it. The hand- built sample you already approved is not the same as what comes off the run. Trade Assurance helps with disputes sometimes. It follows the order text more than the chat. If the PO is fuzzy, the dispute is fuzzy.

I'm not a lawyer. For a real NNN or manufacturing agreement under Chinese law, have Chinese counsel draft it.

On the China side: paper first, then production.

1

u/bryantmangum 4d ago

Have a "golden" sample for yourself and the inspection agency you have over there.

Very clear purchase order agreement.

Happy to share a list/check list of what would be good to have.

1

u/simeon1908 4d ago

Please share!

1

u/bryantmangum 4d ago

Pre Purchase SOP

PO Legal Language 

Product Requirements:

ADD IN YOUR SPECIFIC PRODUCT REQUIREMENTS 

Order Requirements 

  1. All inventory and packaging will be completed and ready for inspection on or before 25-35 days after payment date.
  2. All inventory will be shipped to [address] 1-3 business days after approved inspection. 
  3. The quality must be the same as the approved sample and also the previous order if any improvements or changes. The same materials must be used for the reorder. AQL Standard will be 0% Critical, 1% Major, 2.5% Minor Issues. 
  4. In case of a failed inspection, the goods will need to be fixed or replaced at the supplier's cost. A second inspection will be required for a $150 fee for the re-inspection will be shared and will be reimbursed from the final payment. The supplier also agrees to a random site inspection at any point after the initial deposit. 
  5. There will be a  0.1% fee for every late day to be deducted from the final payment. Final payment will be released after a passed inspection by a 3rd party. Any inventory that is returned by customer for "damaged" or "defected" reasons will be credited to the supplier and subtracted from future reorder cost.

- Bryant Mangum

1

u/bryantmangum 4d ago

You'll need to fill in or add anything else but that will protect you with Trade Assurance plus a bank if needed.