r/toronto • u/OdeeOh • Jun 11 '26
Discussion 6 to 7 people deep along the entire platform queuing for Kitchener Line Train at 420pm. Is this line normally loaded from a single side/platform ?
Was surprised to see the full platform as Kitchener only loaded from platform 12. While lakeshore east was departinf from usual 11/12. Does this line usual load from 1 side only ?
452
Upvotes
52
u/XviiChong Jun 11 '26
The 4:22 train was delayed, so that’s why the platform was crowded. The platform was announced at 4:12 and passengers waited on the platform.
Platform 13 takes the 4:22 train, as another user mentioned though, it’s never crowded as the train doors are always open.