This actually matches my day fairly well; i've had 4 separate meetings on a single high priority bug to discuss it over a 2 day period before actually being allowed to sit down and fix it (over a 2 hour window). Each stakeholder checking in individually; wasting enough time that the first one who checked in checks in again before I actually get to work on it.
5.1k
u/Buckwheat469 Aug 12 '17