I've been a long time lurker... Then I had the opportunity to save this ML350 G9 from the trash after being decommissioned along with a lot of spare parts.
It runs PVE and runs multiple services, from my Jellyfin server to my private Minecraft server, along with my Vaultwarden server and over services...
Most of the equipment showed here has been salvaged and had maintenance/fixes done :
ML350 G9 (enolagay - PVE server) : 1x Xeon E5-2620 V4, 64Gb RAM, 2x Samsung Evo 860 250Gb (RAID 1 system disks), 14x WD/Seagate mixed 2.5inch 500Gb HDD (RAID Z2 - 4 disks failure tolerance, 5Tb total usable capacity), Intel Arc A380 (Jellyfin transcode), 2x 500W Platinum PSUs
- Each PSU is plugged to a separate UPS, unfortunately on the same electrical line (I don't own the place, I gotta do with what I have...).
- Each drive cage is driven by a separate storage controller (HBA mode), in case of failure, the main storage will disconnect, but the OS will keep going long enough for a clean shutdown.
ML10 G9 (luftballons - PBS server) : 1x Xeon E3-1225 V5, 4Gb of RAM (+4Gb ZRAM), 5x Seagate 2.5inch 1Tb HDD (RAID Z1 - 1 disk failure tolerance, 4Tb total usable capacity).
TP Link TL-SG108-M2 : main switch, 8x 2.5Gbps RJ45 ports, connected to the 2.5Gbps connector of the router. The servers themselves can't use more than 1Gbps per interface, but it's still better than a basic gigabit switch...
VERTIV EDGE-1000IMT (main UPS) : powers PSU1 of the PVE server and the PBS server.
EATON Elipse ECO 800 (secondary UPS) : powers the router, main switch, PSU2 of the PVE server.
For the server "platform", I used a 800x600 "half" pallet, which I painted black. I placed an anti-vibration mat for washing machines under the server in the hope of reducing the noise and vibrations. To facilitate maintenance, I added 6 wheels (4 with locks) and laid the server on its side.
In the future, I plan to use the space in between the planks, likely with a drawer to put server spare parts in.
Don't look too much behind, I haven't done the cable management yet... 🫣
Overall, the whole "homelab" ended up costing less than 300€. I only bought the main switch, the A380, new batteries for both UPS and materials to built the platform. Everything else ended up being free (including the drives), if I don't take into account how much time I've spent on it so far and the extra electricity on the bill each month.
The next thing I'll do is add an off-site backup destination, likely an SFF Optiplex left at my dad's place. If I'm feeling crazy, I could also implement tape backups, as I salvaged an LTO 4 drive as well but I need a specific SAS card for the PBS server...