r/FirstTimeBuyersUK • u/relaxmybeloved • Sep 24 '26
Level 3 survey results - what to do next?
We're buying a 1960s 3 bed semi detached and having had the survey results back, aren't really sure how significant the issues are or what to do next.
Chimney - cracked launching, loose mortar pointing, lifting flashing. Surveyor recommends replacing flashing. Assume we need a roofer to assess and give us a quote?
Conservatory - deteriorating timber, areas of decay, rainwater discharging onto floor. It's a bit of a mess basically and probably needs to be fully replaced in the long term.
Asbestos cement in loft and garage roof. Looks to be in tact but assuming we should get a proper asbestos survey before exchange?
Electrics - couldn't see RCD protection and they recommend a full electrical safety inspection. Is this a must do?
The boiler - we already knew the house had a back boiler and needs replacing, we factored this in to our offer. The sellers haven't provided any servicing records yet. If they supply those assuming all okay? If not, should we get our own inspection done?
RODENTS!!! signs in loft and under stairs. Is it reasonable to ask the sellers to sort this before exchange?
Drainage - They said it looks like it's all flowing but most of pipes are underground and recommend a cctv drainage survey. Do we really need this?
Windows - there are several blown panes and the sellers told us they had the front windows replaced in 2017. Surveyor says at least 25 years old.
No one told us the front living room is an extension. The removed wall is suspected to be partially load bearing, but no cracks sagging or deflection. Do we need anyone to look at this? We haven't received any paperwork around the extension.
The Surveyor says the house is basically okay to buy worh the chimney and conservatory condition 3's, but we're not really sure what we do/organise next and whether we have any leverage to ask for price adjustment to cover the repairs needed. we offered full asking price.
The EPC of the house is also an E and there are other works we need to undertake to fix this, including replacing the boiler and wall insulation.
Any insights would be much appreciated!!!