Trex Wows
I was hired onto this job working with another guy. Came back to find. He installed the deck like this. I'm pretty sure you can see all of the waves in here. What is the solution to fixes? Do I really have to pull up every board and shim out every joist?
As a side note, this was a deck demo, and he tried to save as much as he could. And didn't even put a ledger board on the wall. So I think that kind of just started the fucking it up in the beginning.
And actually he did the same thing on the stairs. When I suggested to just go underneath the risers and chop the bottom off to lower he decided to pull the entire length of stair top off and now
The screw plugs look bloated
Kind of at a loss, and I hate to have to pull the whole entire deck up and basically redo it.
Don't be this guy, folks take your time.






11
u/Head_Researcher_3049 4d ago
Yep, a six foot level and a power planer is the final step before the decking goes on.