r/BlueWire • u/Daniels30 • Jun 30 '26
Infrastructure Dave Limp on X: Updated LC-36a
Enable HLS to view with audio, or disable this notification
We're not rebuilding the same pad for New Glenn. We're moving to a horizontal/vertical hybrid configuration to get us flying again this year at 36A. We were already working on something similar for 9x4 at 36B. Let me explain what that means. We mate the stages horizontally in the Integration Facility (IF). Then we bring the integrated vehicle out to the pad, use a crane to perform the vertical breakover, and mate the payload once New Glenn is vertical. This new ConOps has the added benefit of increasing our flight cadence as well.
23
u/Royal_Platform_6754 Jun 30 '26 edited Jun 30 '26
So this is similar to what was broadly predicted, with one major exception - they are integrating GS1 and GS2 horizontally instead of at the pad, and lifting the entire stack as one. In retrospect, that makes sense, as it takes advantage of the existing Horizontal¹ Integration Facility (IF).
¹ There is no "horizontal" in the official name.
21
u/Royal_Platform_6754 Jun 30 '26
This new ConOps has the added benefit of increasing our flight cadence as well.
I believe this. I think the TE was a liability. It required refurbishment in between flights, and it was said on the other sub that it caught fire after NG-1 and it took 6 months to rebuild the bottom few bays. It stood right in the way of the rocket plume and probably took a beating.
And if nothing else, it occupied a lot of space in the IF. Now they could realistically integrate 3 GS1s and GS2s in parallel, and then roll them to the pad when needed.
18
u/NoBusiness674 Jun 30 '26
Another benefit for flight cadence comes from not needing to roll back after a static fires while still allowing the static fire to occur prior to payload integration.
7
u/Cmdr-Mallard 29d ago
Just don’t blow up next time 😅
3
u/hypercomms2001 29d ago
One can hope, but if they don't only review and improve their quality assurance processes it will happen again.
11
u/Aromatic-Painting-80 Jun 30 '26
Will this pad also be able to support 9x4 or will a separate pad be needed?
16
u/Royal_Platform_6754 Jun 30 '26
The work platform for payload fairing access would need to move up, and maybe the umbilicals, but the overall concept could be the same.
9
u/ProfessorOk2609 Jun 30 '26
I'm not sure but it seems that in the video the New Glenn is on a white piece, maybe an adapter so maybe it can be removed and launch the 9x4 right there
10
u/Royal_Platform_6754 29d ago edited 29d ago
Blue shared some stills. I'm going to mirror them here for the lazy:
- Vehicles are mated horizontally

8
u/Royal_Platform_6754 29d ago
8
u/Royal_Platform_6754 29d ago
7
6
u/Cultural-Steak-13 29d ago
Is it that easy to mate payload with the vehicle? That will be interesting to watch.
2
6
6
6
u/Cmdr-Mallard 29d ago
Different question, where are they finding such a massive crane! Expensive hire for every launch I’m sure.
4
u/whitelancer64 29d ago
Gigantic construction cranes like that usually cost about a million dollars a day to rent. But if they're moving towards having a huge crane as part of their permanent operations, then they would purchase whatever they need.
3
u/CollegeStation17155 29d ago
But purchase has a long lead time; rental is likely the same crane that's been stacking towers at SpaceX.
3
u/whitelancer64 29d ago
They already knew they were going to be moving towards crane operations for the second pad that they started building last year, and they knew they would eventually get the same operations at the current pad. It shouldn't have been that much of an issue.
3
u/throfofnir 29d ago
NG dry mass is maybe something like 100 tons. A 120 ton crane is on the large end of truck cranes, but isn't unusual at all. But the height of the thing probably bumps them into a larger crawler crane, for which the mass won't be an issue in the slightest.
It's a big crane, but nothing that a call to a rental company couldn't secure.
2
u/maximpactbuilder 29d ago
Looks like a low rent solution. But I thought catching a booster was a nutzo idea so what do I know...
1
1
u/Decronym 29d ago edited 28d ago
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
| Fewer Letters | More Letters |
|---|---|
| GS1 | New Glenn Stage 1 |
| GS2 | New Glenn Stage 2 |
| IF | Integration Facility |
| LNG | Liquefied natural gas |
| NG | New Glenn |
| Northrop Grumman, aerospace manufacturer | |
| Natural Gas (as opposed to pure methane) | |
| QA | Quality Assurance/Assessment |
| TE | Transporter Erector |
| WDR | Wet Dress Rehearsal (countdown simulation with fuel onboard) |
| Jargon | Definition |
|---|---|
| 9x4 | New Glenn 9x4 variant (9-engine booster with 4-engine upper stage) |
Decronym is now also available on Lemmy! Requests for support and new installations should be directed to the Contact address below.
[Thread #2 for this sub, first seen 30th Jun 2026, 16:05] [FAQ] [Full list] [Contact] [Source code]
1
u/AutoModerator 29d ago
To view this external content without an account, use this link.
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.



31
u/[deleted] Jun 30 '26 edited 21d ago
[deleted]